Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Search

Parcel Attributes

Parcel13103222C
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningO-3
Tucson WardWard 4
Tucson Registered NeighborhoodMyers
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Special Development Requests & Requirements

Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000005778 CLOSED 06/11/2014 N/A Historical Information RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE

Permits

Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Permits - (23)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0823-01882 Issued 08/02/2023 02/06/2024 BLDG 2 UNIT 62 Commercial Building Electrical Reconnect
TC-COM-0723-01832 Issued 07/27/2023 02/06/2024 BLDG 2 UNIT 78 Commercial Building Electrical Reconnect
TR-ROW-0626-00695 Expired 06/09/2026 09/18/2026 Right-of-Way (ROW) Trees and shrub beautification at 6 bus stops on 22nd and 29th street near Rosemont Ave. 08/19/2026 - Request for 30 Day Renewal as of 08/19/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
T08CM00716 EXPIRED 03/03/2008 11/08/2008 #77 COMBO REPAIR: APARTMENT FIRE DAMAGE
T08OT00508 FINAL 03/04/2008 N/A FLOODPLN FLOODPLAIN USE PERMIT: FOR T08CM00716
T09CM01543 WITHDRWN 06/16/2009 N/A COMBO 14 NEW APARTMENT UNITS TO EXISTING APT COMPLEX
T10CM00278 FINAL 02/03/2010 03/15/2011 COMBO ADD 2 40 SQ FT SOLAR HOT WATER SYSTEMS FOR 2 APARTMENT COMPLEX LAUNDRY ROOMS
T10CM00522 FINAL 03/04/2010 10/04/2010 COMBO SOLAR PHOTO VOLTAIC - 88 PANELS
T10OT00272 FINAL 02/03/2010 N/A FLOODPLN FLOODPLAIN USE PERMIT: SOLAR HOT WATER SYSTEM
T10OT00484 FINAL 03/04/2010 N/A FLOODPLN FLOODPLAIN USE PERMIT 5 PV Solar Systems
T12CM07984 FINAL 12/18/2012 06/19/2013 #18 COMBO ELECTRIC RECONNECT
T13CM02106 FINAL 04/10/2013 10/09/2013 #12 COMBO ELECTRIC RECONNECT
T14TC03285 FINAL 12/15/2014 N/A BARRICAD Tucson Water Maintenance Daily 12-04-14
T15CM08509 FINAL 12/04/2015 06/14/2016 #50 COMBO REPL 125 AMP LIKE FOR LIKE;APT
T17CM08951 FINAL 12/05/2017 07/24/2018 COMBO Automatic gate
T18CM05230 FINAL 07/05/2018 01/05/2019 #61 COMBO ELECTRICAL RECONNECT
T19CM07625 EXPIRED 10/16/2019 08/03/2020 #79 COMBO E - ELECTRIC RECONNECT
T20CM00829 FINAL 02/04/2020 08/23/2021 #62 COMBO E - ELECTRIC RECONNECT
T20CM09130 FINAL 12/29/2020 08/25/2021 36 COMBO electric reconnect for apartment 36. Been off for more than 6 months.
T20CM09212 WITHDRWN 12/29/2020 06/27/2021 #36 COMBO Electrical reconnect
T20CM09216 FINAL 12/29/2020 08/25/2021 79 COMBO ELECTRICAL RECONNECT
T22RW01667 FINAL 04/27/2022 07/06/2022 ROW From TEP Pole at 5255 E 29th St, Head E and begin 1595' aerial overlash 144ct fiber. Tie in. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T97EL01554 FINAL 09/24/1997 03/25/1998 #30 ELECT RECONNECT:ELECTRIC:APARTMENT

Code Enforcement

Address: 5255 E 29TH ST
Date - 10/05/2026 9:51 p.m.
Total Number Of Code Cases - (1)
Case Number Case Status Entered Date Exp Date Unit Type Description
CE-VIO1222-00767 Closed - Unfounded 12/01/2022 01/18/2023 WASTE: animal waste accumulating along common areas of complex