Address Search: 226 E NAVAJO RD
Search
Parcel Attributes
| Parcel | 106043260 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 3 |
| Flood Related Information | FEMA Floodplain Area |
| Tucson Registered Neighborhood | Amphi |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 226 E NAVAJO RD
Date - 08/20/2026 11:37 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 226 E NAVAJO RD
Date - 08/20/2026 11:37 p.m.
Total Number Of Permits - (3)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0726-00805 | Approved | 07/10/2026 | N/A | Right-of-Way (ROW) | The Amphi Neighborhood Painting Party will close down the intersection of Navajo Rd. and Fontana Ave., bringing together local neighbors to install city approved traffic calming measures in the form of bollards, planters, plants, and painting to both make their streets safer and beautify their living space. Using a traffic control plan provided by Desert Barricades, we will close down the intersection to cars so people of all ages can plants the plants and paint the street. The event will run 7am to 1pm on September 5th, 2026. Traffic control set up and take down: 5am - 1:30pm | |
| TC-RES-0723-06411 | Issued | 07/10/2023 | 02/04/2024 | Residential Building - One or Two Family | We will tunnel under the back fence and excavate 40' trench from the fence to the back Southside of the house. We will install new 1 1/4" P.E gas pipe with steel raiser from the meter to the house. We will install a new 1/4 turn isolation valve on the riser at the house. We will then run new appropriately sized pipe up and across the roof to three fixtures (1-furnace, 1 water heater, and 1 range) We will install new gas shut offs and gas flex supplies on all fixtures. There will be 3 roof penetrations on all fixtures which will be properly sealed. Work will require cutting open the drywall behind the stove to run new gas line down the wall to the stove. All pipe on the roof and wall will be properly strapped and secured. We may also need to cut a hole in the ceiling to get into the crawl space between the ceiling and the roof in order to drill holes. | |
| T21CM07150 | FINAL | 09/02/2021 | 03/23/2022 | COMBO | Electrical Work service upgrade |