Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2126 S ALVERNON WY
Search
Parcel Attributes
| Parcel | 13012015A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Julia Keen |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2126 S ALVERNON WY
Date - 12/10/2025 7:21 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 2126 S ALVERNON WY
Date - 12/10/2025 7:21 p.m.
Total Number Of Permits - (7)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0924-01057 | Complete | 09/16/2024 | 10/26/2024 | Right-of-Way (ROW) | installation of conduit infrastructure to facilitate installation of fiber optic cabling for the city of Tucson | |
| TR-UTL-0725-01084 | Complete | 07/07/2025 | 10/19/2025 | Right-of-Way (ROW) - Utility | WO T151655 - TEP to install pole grounds. Crews will attach a pole ground wire to the base of the transmission structure and the opposite end to be attached to a ground rod under the surface. Please see attached map for valid street address and work description. | |
| T06CM02446 | WITHDRWN | 04/25/2006 | N/A | COMBO | REPL: LIGHT FIXTURES FOR BILLBOARD | |
| T12BU01150 | WITHDRWN | 09/27/2012 | N/A | BUILD | REMOVAL OF BILLBOARD | |
| T12BU01155 | FINAL | 09/28/2012 | 04/21/2013 | DEMO | REMOVAL OF BILLBOARD (CLEAR CHANNEL #298, TAG #9004491 ALSO KNOWN AS AZ454) | |
| T12BU01156 | VOID | 09/28/2012 | N/A | BUILD | REMOVAL OF BILLBOARD | |
| T21RW02323 | FINAL | 05/12/2021 | 06/13/2021 | ROW | (2) 5X5 bell hole in dirt alley (rear)-- to repair/replace gas line ISSAP NPL NOTE: Proof of notification is required at the time of the preconstruction meeting. |