Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel11301003D
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-1, MH-1
Tucson WardWard 3
Tucson Registered NeighborhoodCampus Farm
Major Street & Route

Gateway Route, Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 1720 E ROGER RD
Date - 12/06/2025 11:05 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Rezoning Cases

Date - 12/06/2025 11:05 p.m.
Total Number Of Rezone Cases - (4)
Case No. Description New Zone Status Status Date
C9-07-34 Wesson Company LLC - Campbell O-1 Expired 12/26/2007
C9-70-47 Geyer - Campbell Avenue MH Effectuated 11/02/2011
C9-73-13 Isermann - Roger Road B-1 Expired 07/27/2011
C9-75-34 Potter - Campbell Avenue R-4 Effectuated 07/19/2011

Permits

Address: 1720 E ROGER RD
Date - 12/06/2025 11:05 p.m.
Total Number Of Permits - (3)
Permit Status Apply Date Expired Date Unit Type Description
TC-UTL-1222-00027 Issued 12/09/2022 10/03/2023 Utilities Permit CHANGES ON THE EXISTING AT&T ANTENNA ARRAY: · INSTALL (2) NEW AT&T ANTENNA WITH INTEGRATED RRH UNIT PER SECTOR, (3) SECTORS, (6) TOTAL ON POSITION 1 · INSTALL (1) NEW DC9 SURGE · INSTALL (1) NEW 24 PAIR FIBER CABLE · INSTALL (3) NEW 6AWG DC CABLES · INSTALL (1) WCS FILTER FOR BETA SECTOR ON POSITION 3 · REMOVE (6) EXISTING TMAs PER SECTOR, (3) SECTORS, (18) TOTAL · REMOVE (3) EXISTING ANTENNAS PER SECTOR, (3) SECTORS, (9) TOTAL · INSTALL (2) NEW ROSENBERGER #2 GROUND WIRE PER MFG. SPEC'S FOR ALL NEW INSTALLATIONS · REMOVE (6) LINES OF COAX CABLES CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: (NO NEW SHELTER PROPOSED) · INSTALL (6) NEW RRHs · INSTALL (1) NEW FLEX21 CABINET · INSTALL (6) NEW TRIPLEXERS · REMOVE (12) EXISTING RRHs · REMOVE (1) EXISTING LTE CABINET · REMOVE (6) EXISTING QUADPLEXERS AC/DC SCOPE: DC POWER PLAN REVIEW: · EXISTING VERTIV NETSURE 512 -48VDC POWER PLANT [NEQ.19918] OUTFITTED WITH (10) HE 2KW -48VDC RECTIFIERS [NEQ. 15930] & (3) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES [NEQ. 15929]. INSTALL (1) ADDITIONAL HE 2KW -48VDC RECTIFIER [NEQ. 15930] TO MEET N+1 REQUIREMENT. · NEW DC BREAKERS IN EXISITNG POWER PLANT AS FOLLOWS ·· (2) 100A [NEQ. 00187] FLX21-2520 ·· (3) 50A [NEQ.00710] AIRSCALE DUAL BAND B25/66 AHFIB ·· (3) 50A [NEQ.00710] AIRSCALE DUAL BAND B12/14 AHLBA ·· (6) 40A [NEQ.00185] AEQ SERIES BATTERY CHECK: · BATTERY RESERVE CAPACITY: REMOVE (32) EXISTING MARATHON M12V155FT BATTERIES. INSTALL (12) NEW GNB M12V180FTX BATTERIES [NEQ.19872] IN BOTTOM SECTION OF NEW DC POWER SYSTEM. INSTALL (20) NEW GNB M12V180FTX BATTERIES [NEQ.16622] IN VERTIV NETXEND FLEX BATTERY CABINET. CONFIGURE BATTERIES FOR -48V OPERATION AS (4) CELLS PER STRING. FIVE BATTERY STRINGS WILL PROVIDE 4.2 HOURS OF BATTERY BACKUP. · NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS. A/C PANEL REVIEW: · SEE PANEL SCHEDULE HVAC UNITS: · SITE HAS TWO EXISTING 4-TON HVAC UNITS, WHICH ARE SUFFICIENT
T15TC02621 EXPIRED 11/18/2015 N/A BARRICAD CELL TOWER WORK
T18CM09572 FINAL 12/07/2018 04/01/2020 COMBO CELL TOWER