Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel12910129A
129101290
JurisdictionTucson
City of Tucson ZoningC-2, R-2
Water Course

Washes

Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Major Streets & Routes

Arterial or Collector

,

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 1230 S CHERRYBELL SV
Date - 10/23/2024 8:41 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
3/4 Mile East To Campbell Avenue 486 None

Rezoning Cases

Date - 10/23/2024 8:41 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-17-09 El Rio Health Center-22nd St C-2 Effectuated 07/11/2017

Special Development Requests & Requirements

Address: 1230 S CHERRYBELL SV
Date - 10/23/2024 8:41 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
T19SA00097 APPROVED 03/11/2019 N/A Design Review Board Request to increase the height of a pole sign from 12' tall to 15' in height - case MSP-19-001 (Singular Sign Design Option)

Permits

Address: 1230 S CHERRYBELL SV
Date - 10/23/2024 8:41 p.m.
Total Number Of Permits - (50)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1122-00076 Complete 11/18/2022 01/18/2023 Right-of-Way (ROW) Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0923-01204 Complete 09/29/2023 12/13/2023 Right-of-Way (ROW) Collect fluid level at groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0924-01137 Inspections 09/27/2024 11/21/2024 Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-UTL-0924-01860 Complete 09/26/2024 10/15/2024 Right-of-Way (ROW) - Utility wo2880934 1230 s cherrybell sv 14-14-19 ne water main repair in ws of cherrybell sv north of 24th st in dirt 8lf/ar
TR-ROW-0924-01121 Needs Resubmittal 09/25/2024 N/A Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0724-00816 Complete 07/17/2024 09/19/2024 Right-of-Way (ROW) Measure water level and sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0723-00959 Complete 07/17/2023 09/27/2023 Right-of-Way (ROW) Sample one groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0723-00953 Denied 07/14/2023 N/A Right-of-Way (ROW) Denied - As Submitted - Please Submit each Well Location as individual permits - Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
TF-FOP-0724-00770 Complete 07/09/2024 07/23/2025 Fire Operational Permit El Rio Cherrybell
TR-ROW-0424-00422 Complete 04/18/2024 06/20/2024 Right-of-Way (ROW) Gauge fluid levels at one groundwater monitoring well location (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
TR-ROW-0423-00604 Complete 04/06/2023 06/21/2023 Right-of-Way (ROW) Gauge fluid levels at two groundwater monitoring wells (2-3 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and 1415 S Cherry Ave., Tucson, AZ 85713 address for the second well.
TF-FOP-0223-00559 Complete 02/23/2023 03/01/2024 Fire Operational Permit State License Facility
TR-ROW-0123-00287 Complete 01/23/2023 03/22/2023 Right-of-Way (ROW) Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
TR-ROW-0124-00078 Issued 01/18/2024 03/20/2024 Right-of-Way (ROW) Gauge and sample one groundwater monitoring well (2 hours). Work zone is in the Kino Parkway N/B exit ramp.
DP18-0180 FINAL 07/27/2018 10/20/2019 DEVPKG SOLAR PARKING CANOPY
DP19-0314 PLAN RFC 12/26/2019 N/A DEVPKG SITE/GRADING - Cherrybell Medical Center, Phase 2 (revision to DP17-0157).
T17CM08687 C OF O 11/21/2017 08/07/2019 BLDG#1 COMBO NEW MEDICAL BLDG
T17RW04238 FINAL 09/25/2017 11/01/2017 ROW MEASURE A GROUNDWATER MONITORING WELL (10 MINUTES) WORK ZONE IS IN THE KINO PARKWAY/N/B EXIT RAMP
T18CM00111 EXPIRED 01/05/2018 04/20/2019 COMBO TEMP CONSTRUCTION TRAILER
T18CM07301 L OF C 09/14/2018 06/18/2019 COMBO ADD COMMERCIAL PV SYSTEM
T18FC00386 FINAL 05/07/2018 08/06/2019 FIRECONS New Wet Fire Sprinkler System
T18FC00431 FINAL 05/23/2018 01/07/2019 FIRECONS INSTALLING 145 LF OF 4" C-400 W/6" OF SHADE SAND AT ALL SIDES.
T18FC00595 FINAL 07/23/2018 06/26/2019 FIRECONS INSTALL A FIRE SPRINKLER MONITOR AND ALARM SYSTEM IN THIS NEW MEDICAL CENTER.
T18FC00960 FINAL 11/29/2018 06/26/2019 FIRECONS Use existing fire panel DACTto monitor existing fire panel
T18OT01248 ISSUED 12/07/2018 06/05/2019 SIGN 3 illum wall signs (E, N, W elevs)
T18RW02015 FINAL 05/03/2018 06/06/2018 ROW SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR) WORK ZONE IS IN THE KINO PARKWAY N/B EXIT RAMP MW-22-11
T18RW03485 FINAL 08/06/2018 09/12/2018 ROW SAMPLE A GROUNDWATER MONITORING WELL( (1 HOUR) WORK ZONE IS ON KINO PARKWAY N/B EXIT RAMP MW-22-11
T18RW04485 EXPIRED 10/04/2018 12/06/2018 ROW CURB INSTALL 495 LF PER PAG SD 209, SIDEWALK INSTALL 455 LF PER PAG SD 200, CURB ACCESS RAMP 16 LF PER PAG SD 207, ALL PER DP 17-0157
T19CM07371 FINAL 10/08/2019 04/18/2023 COMBO MINOR TI EL RIO HEALTH
T19OT00095 ISSUED 01/30/2019 12/10/2019 SIGN Proposed pole sign (Singular Sign Design Option approved / T19SA00097 appeal period ended 4/9/19)
T19RW00627 FINAL 02/05/2019 04/07/2019 ROW 173ft of aerial placement on the NW corner of S Cherrybell Stra & E 23rd ST. Access MH #13241 to splice fiber within.
T19RW01789 FINAL 04/03/2019 05/08/2019 ROW INSTALL OF NEW CONCRETE PAD FOR EXISTING BUS STOP, PAD START AT THE EXISTING SIDEWALK AND WILL BE 20' LONG X 5' WIDE AND 6" DEEP, WITH TOE DOWN 12" ADA BUS IMPROVEMENTS FY 19 36647
T19RW01791 FINAL 04/03/2019 05/10/2019 ROW DEMO 20 FT OF EXISTING SIDEWALK, INSTALL OF NEW CONCRETE PAD FOR EXISTING BUS STOP, PAD START AT THE EXISTING SIDEWALK AND WILL BE 20' LONG X 5' WIDE AND 6" DEEP WITH TWO NEW SIDEWALK TRANSITIONS. WORK IS LOCATED ON NB EXIT RAMP OF KINO BL ONTO 22ND ST. ADA BUS IMPROVEMENTS FY 19 36647
T19RW04468 FINAL 08/16/2019 09/18/2019 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
T20FC00094 FINAL 02/04/2020 08/31/2020 FIRECONS Install an Alarm Strobe in the New Pharmacy Alcove, Move existing strobe into the Pharmacy
T20RW00766 FINAL 02/07/2020 03/19/2020 ROW SAMPLE A GROUNDWATER MONITORING WELL (1 HOUR). LOCATION IS IN KENO PKWY N/B OFF-RAMP.
T20RW04561 FINAL 08/11/2020 09/23/2020 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
T21RW00681 FINAL 02/10/2021 03/24/2021 ROW SAMPLE A GROUND WATER MONITORING WELL (1 hour). WORK ZONE IS IN THE KINO PARKWAY N/B EXIT RAMP.
T21RW02451 FINAL 05/18/2021 08/27/2021 ROW N.861814- ALONG S. CHERRYBELL ACCESS MH 13241 TO SPLICE EXISTING CABLE IN EXISTING MANHOLE. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T21RW03686 FINAL 08/11/2021 09/05/2021 ROW WATER REPAIR/REPLACE - APPROXIMATELY 5 LF IN DIRT. EMERGENCY - AFTER THE FACT PERMIT
T21RW03715 FINAL 08/12/2021 09/12/2021 ROW W/O# 21R2152 - REPAIR LEAKING MAIN @ 6 LF. EMERGENCY AFTER THE FACT
T21RW03744 FINAL 08/13/2021 09/29/2021 ROW SAMPLE A GROUNDWATER MONITORING WELL, MW-22-11 (1 HOUR). LOCATION IS IN KINO PKWY N/B OFF-RAMP. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T21RW04911 FINAL 11/03/2021 12/08/2021 ROW SAMPLE A GROUNDWATER MONITORING WELL (1 HOUR). WORK ZONE IS IN THE KINO PARKWAY N/B EXIT RAMP 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T22FO00078 FINAL 01/26/2022 08/08/2022 FIREOPER EL RIO CHERRYBELL HEALTH CENTER - B OCCUPANCY.
T22RW00668 FINAL 02/25/2022 04/08/2022 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T22RW01309 FINAL 04/05/2022 06/16/2022 ROW Collect fluid levels at groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813.
T22RW02004 ISSUED 05/27/2022 10/27/2022 ROW N.945170-1- AT CORNER OF S. CHERRYBELL SV AND E. 23RD ST TO ACCESS MH 13241 TO SPLICE EXISTING CABLE. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 4. MAINTAIN PEDESTRIAN ACCESS 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722
T22RW02937 FINAL 08/15/2022 09/22/2022 ROW Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
T22RW03425 ISSUED 09/20/2022 10/22/2022 ROW Job Order Contract (JOC) for Traffic Signal & Street Light Construction, CONTRACT NO. 181906 REPLACING LIGHT POLE FOUNDATION AND POLE ON NORTHBOUND S KINO PW, SOUTH OF 22ND ST. ADDRESS ON APPLICATION: NB SOUTH KINO PARKWAY ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
T22RW03610 ISSUED 10/04/2022 11/10/2022 ROW Measure water level at a groundwater monitoring well (45 minutes). Work zone is in the Kino Parkway N/B exit ramp. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.