Activity Search: TR-UTL-0726-01115
Activity
Parcel Attributes
| Parcel | 10304001Y |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | RX-1 |
| Tucson Ward | Ward 3 |
| Major Street & Route | Scenic Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 07/23/2026 4:23 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0726-01115 | Needs Resubmittal | 07/07/2026 | N/A | Right-of-Way (ROW) - Utility | MMR Fiber-- SEGMENT 2 (Plan Phase 2) - THIS JOB PLACES 4600' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE. (DTM Note-- Refer to Attachments for Related Permit from Contractor) |