Activity Search: TR-ROW-0626-00689
Activity
Parcel Attributes
| Parcel | 11506107B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 3 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
| Tucson Registered Neighborhood | Sugar Hill |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/28/2026 1:22 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0626-00689 | Expired | 06/08/2026 | 08/12/2026 | Right-of-Way (ROW) | Sawcut and Demo two (2) old asphalt drive way aprons on Stone Ave and 7th Ave. Replace with new asphalt and concrete aprons per approved civil plans. 08/10/2026 - Request for 30 Day Renewal as of 08/12/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. |