Activity Search: TC-BCA-0926-00245
Activity
Parcel Attributes
| Parcel | 11449042H |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 2 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Plans
Date - 10/13/2026 2:36 p.m.
Total Number Of Plans - 1
| Plan Number | Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-BCA-0926-00245 | Complete | 09/22/2026 | N/A | Appeal - Building Official | Extend permit due to material delays Solar panels and racking materials have been loaded onto the roof, and the system layout has been completed in preparation for installation. Remaining Work and Anticipated Schedule: Construction is currently anticipated to be completed by October 30, 2026, with Permission to Operate (PTO) and power generation anticipated by November 30, 2026. The remaining scope of work includes: ● Installation of the racking system, solar panels, and inverters. ● Completion of all required DC and AC wiring and associated system components. ● Completion of the final electrical tie-in. ● Scheduling and completion of required final inspections. ● Completion of the utility interconnection process and receipt of Permission to Operate (PTO). |