Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel11449042H
JurisdictionTucson, Pima County
City of Tucson ZoningC-2
Tucson WardWard 2
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 7990 E TANQUE VERDE RD
Date - 10/13/2026 1:24 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-89-02 Sabino - Tanque Verde 7343 7428

Permits

Address: 7990 E TANQUE VERDE RD
Date - 10/13/2026 1:24 p.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
T21OT00423 Expired 06/01/2021 06/14/2023 Sign - Permanent 2-illum wall signs
TC-COM-0126-00062 Issued 01/15/2026 09/21/2027 Commercial Building Install roof mounted solar pv system of 77 modules @ 41.58 kW DC

Plans

Address: 7990 E TANQUE VERDE RD
Date - 10/13/2026 1:24 p.m.
Total Number Of Plans - (2)
Plan Number Status Application Date Exp Date Unit Type Description
T06BA00027 Approved 01/23/2006 N/A -- Stormwater Basin
TC-BCA-0926-00245 Complete 09/22/2026 N/A -- Building Code Appeal Extend permit due to material delays Solar panels and racking materials have been loaded onto the roof, and the system layout has been completed in preparation for installation. Remaining Work and Anticipated Schedule: Construction is currently anticipated to be completed by October 30, 2026, with Permission to Operate (PTO) and power generation anticipated by November 30, 2026. The remaining scope of work includes: ● Installation of the racking system, solar panels, and inverters. ● Completion of all required DC and AC wiring and associated system components. ● Completion of the final electrical tie-in. ● Scheduling and completion of required final inspections. ● Completion of the utility interconnection process and receipt of Permission to Operate (PTO).