Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T22RW00459
Activity
Permits
Date - 11/23/2024 11:19 a.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22RW00459 | Final | 02/09/2022 | 06/03/2022 | ROW | Tie into Pole riser down and Head N 6' pulling 48ct fiber through existing Cox Conduit and intercept existing Cox Vault. Continue Heading N 91' pulling 48ct fiber through existing Cox Conduit. Head E 6' and continue pull through onto private property. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. ARTERIAL / COLLECTOR FLOOD PLAIN ZONE WORK IS BEHIND 4545 N 1ST AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION- 4502 N 1ST AV |