Activity Search: T21RW00818
Activity
Parcel Attributes
| Parcel | 117170170 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | OCR-2 |
| Tucson Ward | Ward 6 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District, Downtown Core |
| Rio Nuevo Downtown | Rio Nuevo - Downtown |
| Rio Nuevo Multipurpose Facilities District | Yes |
| Redevelopment | Downtown Redevelopment District |
| Tucson Registered Neighborhood | Armory Park |
| Major Street & Route | Gateway Route |
| National Register Historic District | Armory Park Historic Residential District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/17/2026 1:43 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21RW00818 | Final | 02/19/2021 | 04/20/2021 | ROW | From TEP Pole in NE Corner of 145 S 6th Ave, Head S and begin 110' aerial overlash 144ct fiber. Head W and continue 326' aerial overlash 144ct fiber. Riser down pole, head S, and begin 56' metro bore placing 2-2" conduit and 48ct fiber. Head E and continue 74' trench/bore on sidewalk placing 2-2" conduit and 48ct fiber. Head S and continue 367' trench/bore on sidewalk placing 2-2" conduit 48ct fiber. Place 4x4' pot hole and new Cox Vault on sidewalk. Tie in. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ***Sun Tran shall be notified of interruption of the bus stop. Parking interruptions shall be coordinated with Park Tucson. Local businesses, residences and the Tucson Children’s Museum impacted by the construction shall be notified prior to the start of construction.*** |