Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel117170170
JurisdictionTucson, Pima County
City of Tucson ZoningOCR-2
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
RedevelopmentDowntown Redevelopment District
Tucson Registered NeighborhoodArmory Park
Major Street & Route

Gateway Route

National Register Historic DistrictArmory Park Historic Residential District
Structure on National Register of Historic Places

Contributor

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 08/17/2026 1:43 a.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
T21RW00818 Final 02/19/2021 04/20/2021 ROW From TEP Pole in NE Corner of 145 S 6th Ave, Head S and begin 110' aerial overlash 144ct fiber. Head W and continue 326' aerial overlash 144ct fiber. Riser down pole, head S, and begin 56' metro bore placing 2-2" conduit and 48ct fiber. Head E and continue 74' trench/bore on sidewalk placing 2-2" conduit and 48ct fiber. Head S and continue 367' trench/bore on sidewalk placing 2-2" conduit 48ct fiber. Place 4x4' pot hole and new Cox Vault on sidewalk. Tie in. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ***Sun Tran shall be notified of interruption of the bus stop. Parking interruptions shall be coordinated with Park Tucson. Local businesses, residences and the Tucson Children’s Museum impacted by the construction shall be notified prior to the start of construction.***