Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Activity

 

Parcel Attributes

Parcel116274530
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-1
Tucson WardWard 1
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 09/22/2026 7:56 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
T21CM06111 Withdrwn 07/27/2021 N/A COMBO I am converting a 120V 20A branch circuit (currently feeding the furnace in the air handler closet) to a 240V 15A branch circuit (to feed a new air handler in the same closet) per the attached wiring diagram. Complicating the project is the fact that the electrical panel was wired (in 1995) with multi-wire branch circuits. So breakers #17 (furnace - red wire) and #19 (washer - black wire) use the same 12/3 romex cable and share its neutral white wire. In order to convert #17 (and #19) slots to 240V, I will need to move the #19 breaker to the #27 slot and run a separate 12/2 romex cable from #27 to the "washer" wiring located in a junction box (in the sealed crawl space above the laundry room). This will free up the black and white wires currently used by #19. The #17 1-pole 20A circuit breaker will then be replaced with a 2-pole 15A HACR circuit breaker (per the new air handler spec) in slots #17 and #19. Breaker #17's white wire will be moved from the neutral bus to the #19 breaker, and re-id'd with black marker. The now-unused black wire will be capped with a wire nut. Finally, the 120V 15A fused outlet currently in the air handler closet will be replaced with a 240V 30A non-fuse disconnect switch.