Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: T19RW04029
Activity
Parcel Attributes
Parcel | 117110180 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | HC-3 |
Tucson Ward | Ward 1 |
Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | El Presidio |
National Register Historic District | El Presidio Historic District |
Structure on National Register of Historic Places | Contributing |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Permits
Date - 11/23/2024 3:30 a.m.
Number Of Permits - (1)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T19RW04029 | Final | 07/19/2019 | 11/27/2019 | ROW | BORING AND SOME TRENCHING TO INSTALL UG FIBER OPTICS CABLE PROPOSED WORK DAYS JULY 22-25TH ADDRESS ON APPLICATION-120 NORTH COURT AV This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. PER R1: Asphalt and concrete restoration for new fiber optic cable installation owned by the Zayo Group. (Black Canary 3) OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. TEMPORARY NOISE EXEMPTION (TNE) IS ATTACHED TO THIS PERMIT, TNE FROM OCTOBER 24, 2019 - NOVEMBER 23, 2019 FROM 6: 00 PM- 6:00 AM DAY WORK GRANTED BETWEEN 9:00 AM - 3:30 PM FOR RESTORATION WORK ONLY. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC CONTROL SHELL BE REMOVED PRIOR TO 3:30 PM WORK IN RESIDENTIAL AREA WILL BE PERMITTED DURING 6:00 PM - 10:00 PM NO WORK SHELL BE DONE ON NOVEMBER 11TH 2019 - 7:00 AM- 2:00 PM TO ACCOMMODATE CIVIL EVENT (VETERANS DAY PARADE) POTHOLES/BORE HOLES REPAIRS ARE AS FOLLOWED: * TUCSON MIX (PG 70-10) WILL BE USED ON ALL PATCHING WORK * NO SAW CUTS PERMITTED IN THIS AREA, ASPHALT THAT IS DISTURBED TO FILL POTHOLES, MUST BE A CLEAN CONSISTENT CUTS THAT MEETS PAVEMENT MORATORIUM STANDARDS. *INDIVIDUAL PATCHES SPACED MORE THAN 8 FEET FROM ONE ANOTHER CAN BE DONE. *ALL PATCHES SPACED LESS THAN 8 FEET FROM ONE ANOTHER HAVE BEEN ADDRESSED AND APPROVED TO PATCH PER CLUSTER. CONTRACTOR WILL FOLLOW AND FILL ALL POTHOLES ADDRESSED ON PATCHING PLAN PROVIDED TO THE CITY, AND ATTACHED TO THIS PERMIT. *PATCH WIDTH MUST BE A MINIMUM OF 2 FEET WIDE AND WILL GO FROM THE FACE OF THE CURB TO APPROPRIATE 2 FEET DIMENSION. *IF POTHOLES/BORE HOLES ARE OUTSIDE THE 2 FOOT WIDTH THE PATCH WILL BE ADJUSTED TO THE APPROPRIATE WIDTH TO COVER. * CONGRESS STREET IS THE ONLY EXCEPTION TO THE POTHOLES/BORE HOLES REPAIRS. CONGRESS STREET IS A MILL AND FILL ONLY. PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. |