Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T22PRE0212
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2022 | JPEELDA1 | COT NON-DSD | FIRE | Completed | Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner Tucson Fire Department |
10/03/2022 | JCARLTO1 | LANDSCAPE | REVIEW | Completed | |
10/04/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Completed | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
10/05/2022 | PAUL CAMARENA | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Paul Camarena, Planner PROJECT: Thursday Pre-submittal meeting – T22PRE0212 Address: 602 N 4TH AV Parcel(s): 11704058C Zoning: C-3 Existing Use: Existing Proposed Use: Existing TRANSMITTAL DATE: 10/05/2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The use is Food service, which is permitted in the C-3 zone. 3. Vehicular parking requirements are 1 space per 100 sq. ft and outdoor seating area. 4. Bicycle Parking requirements are Short-term parking 1 space per 2,000 Sq ft GFA , the minimum requirement is 2 spaces , Long 1 space per 12,000 sq. ft. GFA, the minimum requirement is 2 spaces; 5. This site will not meet the required parking spaces, The Infill Incentive District overlay may be used to reduce the parking requirement. 6. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. Pedestrian access along the street is required. Show complete pedestrian circulation for the site. Grant does not have a sidewalk. 7. Maximum height in the C-3 zone is 75ft. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. 9. My recommendation is to do the TI as a separate submittal from the proposed roof top structure. If you have any questions, please contact me at Paul.Camarena@tucsonaz.gov |
10/05/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 200 - 230 pm - T22PRE0212 - 602 N 4TH AV - SiteIID 4TH Ave Collective Completed 1. Tucson Water's New Area Development Unit has no objections to the proposed development. 2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
10/05/2022 | JGARCIA9 | ENGINEERING | REVIEW | Completed | Site Engineering has no comments Joshua Garcia joshua.garcia@tucsonaz.gov |