Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T22PRE0169
Parcel: Unknown

Address:
5639 E 5TH ST

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T22PRE0169
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2022 JPEELDA1 COT NON-DSD FIRE Completed Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
08/10/2022 SCABRAL1 ENGINEERING REVIEW Completed 1. Provide waste stream calculations.

2. Relocate trash dumpster to an appropiate location. Make sure to have an enclosure.


Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/10/2022 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

PROJECT: Quad Plex
ACTIVITY NO. T22PRE0169
ADDRESS/PARCEL: 5639 E 5th St
ZONING: R-3

7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.

" trees are required to be placed within the north parking areas

Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40' of a tree is only one of the requirements. The intent is to provide as much shade on the asphalt as possible, and the requirement is 1 tree per 4 parking spaces; trees are expected to be placed within the parking area itself to provide shade on asphalt. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.

Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual - Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening. Demonstrate maximizing water harvesint

If you have any questions about this transmittal, contact Anne Warner, RLA
PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov
08/10/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 130 - 200 pm - T22PRE0169 - 5639 E 5TH ST
Site: Quad Living 5th

1. Tucson Water's New Area Development Unit has no objections to the proposed development and offers the following comments for your convenience.

2. The existing buildings on this site are supplied water via an existing 3" cement asbestos water main on the north side of the property in Baker Street.

3. This existing 3" water main does not have the capacity necessary to serve any necessary on-site fire hydrants and/or fire suppression sprinkler systems.

4. If on-site fire hydrants and/or fire suppression sprinkler systems must be constructed for this project, they will need to be connected to the existing 12" cement asbestos water main in the south half of 5th St.

5. This project may or may not be affected by Tucson Water's Road Recovery Prop 101 Rehab Pck 5 CIP project, which is currently in the design phase. You may contact Mr. Walter Breitenstein, Tucson Water's Project Manager for this CIP project at walter.breitenstein@tucsonaz.gov for information about this CIP project.

6. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
08/11/2022 SAMUEL ROGERS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Samuel Rogers, Planner

PROJECT: Thursday Pre-submittal meeting - T22PRE0169
Address: 5639 e 5th ST
Parcel(s): 127035430
Zoning: R-3
Existing Use: Medical Service - Outpatient/Multifamily
Proposed Use: Multifamily

TRANSMITTAL DATE: 08/10/2022

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Multifamily is an allowed use in the R-3 zone is subject to use-specific standard UDC 4.9.7.B.6.
3. If the site is proposed to be expanded by 25% or more the entire site will need to be brought up to code.
4. If the site needs to meet full code compliance, the south parking lot will need to be reconfigured to not back out into the ROW.
5. East 5th St. is a Major Street and Route. 5th St. appears to be at its full width of 90'. Major Street and Route setbacks will apply to an new structures on all street sides.
6. R-3 allows for a maximum density of 36/acre. This site is approximately .78 acres allowing for 28 units, the proposed 20 units do not exceed the density maximum.
7. The required setback on the east and west is 10' or ¾ the height of the structure's wall.
8. The maximum allowed height is 40'.
9. Pedestrian connection will be required from the new units to the adjacent ROW.
10. See engineering comments about the trash enclosure.
11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932.
08/15/2022 DSTIFFE1 COT NON-DSD TRAFFIC Completed No Comments