Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T22PRE0162
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/28/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Approved | |
08/03/2022 | SBLOOD1 | ENGINEERING | REVIEW | Completed | 1. Show history of lot divisions, Minor subdivision or block plat may be required. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
08/03/2022 | JPEELDA1 | COT NON-DSD | FIRE | Completed | Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
08/04/2022 | AWARNER1 | LANDSCAPE | REVIEW | Completed | CDRC TRANSMITTAL PROJECT: 3838 Oracle Plaza Joint Venture ACTIVITY NO. T22PRE0162 ADDRESS/PARCEL: 3802 N Oracle ZONING: C-2 7.6 Landscaping and Screening The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10. • A 10’ minimum street landscape border is required along all public streets • Minimum 10’ Interior landscape borders are required adjacent to any single-multi family use, regardless of zoning Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40’ of a tree is only one of the requirements. The intent is to provide as much shade on the asphalt as possible, and the requirement is 1 tree per 4 parking spaces; trees are expected to be placed within the parking area itself to provide shade on asphalt. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a. Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual – Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf If you have any questions about this transmittal, contact Anne Warner, RLA PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov |
08/04/2022 | NMARTEL1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Nicholas Martell, Lead Planner PROJECT: Thursday Pre-submittal meeting - T22PRE0162 Address: 3802 N Oracle Parcel(s): Multiple Zoning: C-2, R-2 Existing Use: Shopping Center Proposed Use: Shopping Center TRANSMITTAL DATE: 08/04/2021 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 and 2-07 2. Each parcel must have street access or a cross access agreement. 3. C-2 Lots do not have a minimum lot size. R-2 lots must be a minimum of 5,000 sq ft 4. Determine whether the site will operate as a shopping center. 5. The provided setbacks appear to be correct. 6. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. Pedestrian access along the street is required. Show complete pedestrian circulation for the site. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Nicholas.Martell@tucsonaz.gov |
08/04/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 130 - 200 pm - T22PRE0162 - 3802 N ORACLE Site: Oracle Plaza 1. Tucson Water's New Area Development Unit has no objections to the proposed development and offers the following comments for your convenience: 2. This project appears to be a re-configuration of the lot lines, and the following comments are based on that understanding. Please contact me if this understanding is incorrect. 3. There is an existing 8" public water main on this site (PN 012-1978) in an existing public water easement recorded at DKT 7807 PG 1194. 4. The existing public water main and the existing public water easements on this site must be retained during any re-configuration of the lot lines. 5. No permanent structures including walls or fences may be constructed with the existing public water easements. 6. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |