Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T22PRE0159
Parcel: Unknown

Review Status: Active

Review Details: PREAPPLICATION MEETING

Plan Number - T22PRE0159
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/27/2022 LOREN MAKUS ELECTRICAL ENGINEERING REVIEW Completed 1. Site is in a balanced basin. Balanced basin detention and first-flush retention will be required.
2. Commercial rainwater harvesting requirements must be met.
3. We will require use of low impact design standards to the maximum extent practibable.

Loren Makus
loren.makus@tucsonaz.gov
08/02/2022 NMARTEL1 ZONING REVIEW Completed Rezoning Pre-Submittal Transmittal

FROM: Nick Martell
PDSD Zoning Review

PROJECT: Rezoning Pre-submittal meeting T22PRE0159
Address: 1511 W Valencia
Parcel(s): 13824101M
Existing Zoning: 0-3
Proposed Zoning: C-2
Existing Use: Vacant
Proposed Use: Storage-Personal Storage

TRANSMITTAL DATE: August 2, 2022

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Proposed use and use-specific standards: 4.9.10.C.3 & .6
3. Development standards: 40' Building Height
4. Perimeter yard setbacks: Adjacent to Commercial Zones (all): 0' setback
5. Applicable street setbacks: Valencia is a Major Street and Route and subject to MS&R Setbacks
6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445
7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698
8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov
9. Additional comments:
a. Storage developments are subject to 30' PAALs
10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at nicholas.martell@tucsonaz.gov.
08/02/2022 BILLIE LEE COMMENTS COMMENTS Active
08/02/2022 JOHN BEALL M&C Public Hearing 4 Plan Amendment Set M&C Public Hearing Date Active
08/03/2022 JPEELDA1 FIRE REVIEW Completed If gates are provided a KNOX Gate Key switch shall be provided and a KNOX Box.
Aerial Access that is compliant with IFC 2018 Appendix D, Section D105 shall be provided for all buildings over 30'
Existing and new Fire hydrant locations shall be shown on the development plan IFC 2018, Chapter 5, Section 507.5
F.D.C. Location (Shall be facing the street) IFC 2018, Chapter 9, Section 912
Plans (Building Plans) shall show that the buildings shall be tested for Emergency Responder Radio Coverage IFC 2018, Chapter 5, Section 510
Areas designated as aerial access shall also have a note that obstructions i.e.: canopies, solar shades and large trees shall never be placed in these areas.

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner