Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T22PRE0155
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T22PRE0155
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/26/2022 PAUL CAMARENA ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Paul Camarena, Planner
PROJECT: Thursday Pre-submittal meeting – T22PRE0155
Address: 775 W SILVERLAKE RD
Parcel(s): 11811015Q
Zoning: I-1
Existing Use: Transportation Service Land carrier
TRANSMITTAL DATE: 7/26/2022

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. It appears that the loading zone will remove 43 parking spaces, update the parking calculation.
3. The Pedestrian circulation from Silverlake road has been moved. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. Pedestrian access along the street is required.
4. Previous permit T21BU00208 is in Return for correction status. This permit is a fence/Wall permit in order to get this permit approved please provide the necessary information to this development package.
5. Access lanes and PAALs must be setback at least one foot from: An open structure, such as a carport or covered pedestrian access path as measured from the closest part of the structure or roof overhang;
6. The Street setback is 21.5 ft measured from the back of the future curb.
7. Please provide an expansion calculation as it appears that there is more than a 25% expansion. DP18-0235 is currently in Final status a New development package is required, It is acknowledged that aspects of the previous DP are going to be included in this submittal. The current review time is 25 working day review cycle.
8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Paul.Camarena@tucsonaz.gov
07/27/2022 DSTIFFE1 COT NON-DSD TRAFFIC Completed
07/27/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Denied 200 - 230 pm - T22PRE0155 - 775 W SILVERLAKE
Site: DTU2

1. There are public water mains in public water easements along the north and west sides of the existing building. No awnings may be constructed over these public water lines and easements, as the awnings would interfere with Tucson Water's ability to dig up these public water mains should that become necessary.

2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
07/27/2022 JVINCEN1 COT NON-DSD FIRE Completed No comments

john.vincent@tucsonaz.gov
5203495581
07/27/2022 SBLOOD1 ENGINEERING REVIEW Completed No comments

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
07/28/2022 AWARNER1 LANDSCAPE REVIEW Completed Please make sure that there are sufficient quantities of trees in the parking areas.