Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T22PRE0150
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/06/2022 | LOREN MAKUS | ELECTRICAL ENGINEERING | REVIEW | Completed | This site is currently within a FEMA Special Flood Hazard Area. Engineering is reviewing the materials supporting a CLOMR application.PDSD Engineering will not be requesting any special conditions for the Special Exception. Loren Makus loren.makus@tucsonaz.gov |
07/19/2022 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
07/19/2022 | NMARTEL1 | ZONING | REVIEW | Completed | FROM: Nick Martell PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting T22PRE0150 Address: 7655 S Kolb Parcel(s): 1412204W Existing Zoning: RH Existing Use: Vacant Proposed Use: Civic-Protective Services TRANSMITTAL DATE: March 15, 2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Proposed use and use-specific standards: The proposed use is not listed as a permitted use in the UDC due to a clerical mistake in carrying over standards from the Land Use Code. The Civic-Protective Services use is allowed with one use specific standard: 4.9.13.F 3. Development standards: 30 ft building height (Scenic Corridor Zone) 4. Perimeter yard setbacks: Adjacent to residential zones = 4(H). Adjacent to non-residential zones = 0. 5. Applicable street setbacks: Kolb RD is a Major Street. MS&R setbacks are required as measured from the back of the future or existing curb. 6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445 7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698 8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov 9. Additional comments: a. Please refer to the standards in the Approach Departure Corridor overlay in 5.6.8.B for the performance standards. Any variation from those standards will require a zoning examiner's special exception. -No more than 20 employees per acre of site area at any time may be accommodated by intention, design, or in fact; -The minimum project site area is five acres ; and, -The maximum FAR is .30 of the project site area. b. The site is in the ADC-2 overlay zone c. The site is in the NCD-A overlay zone d. The parcel is affected by the ERZ overlay zone 10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at nicholas.martell@tucsonaz.gov. |
07/19/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
07/19/2022 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active |