Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T22PRE0122
Review Name: PREAPPLICATION MEETING
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/14/2022 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active | |
| 06/14/2022 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
| 06/14/2022 | JPEELDA1 | FIRE | REVIEW | Completed | You will have to provide a secondary access/exit and or provide fire department trun around options. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@tucsonaz.gov 520-837-7033 Fire Plans Examiner |
| 07/05/2022 | NMARTEL1 | ZONING | REVIEW | Completed | Rezoning Pre-Submittal Transmittal FROM: Nick Martell PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting T22PRE0122 Address: 1307 W Speedway Parcel(s): 11612145A Existing Zoning: 0-3 Proposed Zoning: C-1 Existing Use: Vacant Proposed Use: Commercial-Food Service TRANSMITTAL DATE: July 05, 2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Proposed use and use-specific standards: standard 4.9.4.M.1 & 5 and 4.9.13.O 3. Development standards: a. 30' Maximum Building Height b. No Lot Coverage Maximum 4. Perimeter yard setbacks: Adjacent to R-2 = 1 ½ H. Adjacent to O-3 zone = 0. 5. Applicable street setbacks: Speedway is a Major Street and is subject to a 21' setback as measured from the back of the existing or future curb. 6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445 7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698 8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov 9. Additional comments: a. A lot combination may be required to operate as one site. 10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at nicholas.martell@tucsonaz.gov. |
| 07/06/2022 | LOREN MAKUS | ELECTRICAL ENGINEERING | REVIEW | Completed | 1. Full floodplain analysis is required. Compliance with floodplain requlations will be required. 2. Site must meet commercial water harvesting requirements. 3. Site is in balanced basin. We will request critical basin detention and first-flush retention. 4. Solid waste configuration must meet requirements of TS 8-01. Loren Makus loren.makus@tucsonaz.gov |