Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T22PRE0095
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/11/2022 | JPEELDA1 | FIRE | REVIEW | Completed | Dead end access lanes in excess of 150' shall be provided with a turn around IFC 2018, Appendix D. Buildings in excess of 30' shall be provided with aerial access IFC 2018, Appendix D, Section D105 Building will require a fire sprinkler and fire alarm system Questions Jennifer Peel-Davis Fire Plans Examiner 520-837-7033 Jennifer.Peel-Davis@Tucsonaz.gov |
05/17/2022 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active | |
05/17/2022 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
05/18/2022 | NMARTEL1 | ZONING | REVIEW | Completed | Rezoning Pre-Submittal Transmittal FROM: Nick Martell PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting T22PRE0095 Address: 3861 E 3rd st. Parcel(s): 125-11-163D Existing Zoning: O-1 Proposed Zoning: R-3 Existing Use: Commercial-Administrative and Professional Office Proposed Use: Residential-Multifamily Residential TRANSMITTAL DATE: May 18, 2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Proposed use and use-specific standards: 4.9.7.B.6 3. Development standards: 40 ft building height 4. Perimeter yard setbacks: Adjacent to R-3 = 10' or ¾ H 5. Applicable street setbacks: Alvernon and 3rd are subject to Major Street and route setbacks. Setbacks will be measured from the back of the future or existing curb. Alvernon has a proposed width of 120'. The current right of way width appears to be 90'. Please contact the Department of Transportation and Mobility for more information: David.Stiffey@tucsonaz.gov 6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445 7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698 8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov 9. Additional comments: a. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. b. Any demolition of structures older than 50 years old will require architectural documentation 10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at nicholas.martell@tucsonaz.gov. |
05/25/2022 | LOREN MAKUS | ELECTRICAL ENGINEERING | REVIEW | Completed | 1. There are no special floodplain, drainage or access issues for this site. 2. As usual, for infill rezoning cases, we will ask for retention and detention modeled from vacant conditions. Loren Makus loren.makus@tucsonaz.gov |