Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: T22PRE0090
Parcel: Unknown

Review Status: Active

Review Details: PREAPPLICATION MEETING

Plan Number - T22PRE0090
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
05/03/2022 JOHN BEALL M&C Public Hearing 4 Plan Amendment Set M&C Public Hearing Date Active
05/03/2022 BILLIE LEE COMMENTS COMMENTS Active
05/04/2022 LOREN MAKUS ELECTRICAL ENGINEERING REVIEW Completed 1. Site is in balanced basin. Critical basin detention will be requested as a condition of rezoning.
2. Low impact development design elements in the retention/detention manual will be required to the maximum practicable.
3. The site will be required to meet the requirements of the Commercial Rainwater Harvesting Standards.
4. Access and parking for existing structure that may remain will need to be developed to multifamily standards.

Loren Makus
loren.makus@tucsonaz.gov
05/04/2022 NICHOLAS ROSS ZONING REVIEW Completed Rezoning Pre-Submittal Transmittal

FROM: Nick Ross
PDSD Zoning Review

PROJECT: Rezoning Pre-submittal meeting T22PRE0090
Address: 1455 N Silverbell Rd
Parcel(s): 115-21-013A, 115-21-011C, 115-21-011B
Existing Zoning: R-1
Proposed Zoning: R-2
Existing Use: Single Family
Proposed Use: Multifamily

TRANSMITTAL DATE: May 4, 2022

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Proposed use and use-specific standards: 4.9.7.B.6, .9, & .10
3. Development standards: 75% Lot coverage, 25 ft building height
4. Perimeter yard setbacks: 10ft or 3/4H.
5. Applicable street setbacks: Speedway Blvd is a Scenic Corridor. Compliance with the buffer is required. Silverbell Rd is identified as a Major Street and Route. The setback along this street will be 21ft or the height of the structure as measured from the back of the future curb location.
6. Parking requirements: Calculations provided are accurate. See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445
7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698
8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov
9. Additional comments:
a. Site is within Hillside Development Zone
10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at nicholas.ross@tucsonaz.gov.
05/11/2022 JPEELDA1 FIRE REVIEW Completed All buildings shall have fire sprinklers installed. You shall also have fire hydrants installed inside the subdivision. Roads shall be 26' wide exclusive of curb and shoulders.

Jennifer Peel-Davis
Fire Plans Examiner
520-837-7033
Jennifer.Peel-Davis@Tucsonaz.gov