Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T22PRE0067
Review Name: PREAPPLICATION LABELS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/30/2022 | JPEELDA1 | COT NON-DSD | FIRE | Completed | New building might require fire sprinklers please contact me so that we can discuss the size, type of construction, hydrant requirements and so on. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
| 04/13/2022 | AWARNER1 | LANDSCAPE | REVIEW | Passed | |
| 04/13/2022 | DSTIFFE1 | COT NON-DSD | TRAFFIC | Completed | T22PRE0067 Comments: No Comments. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
| 04/13/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 230 - 300 pm - T22PRE0067 - 4433 E BERMUDA ST - Minor Subdivision/ Block Plat: Divide one lot into two lots 1. Tucson Water's New Area Development Unit has no objections to the proposed development and offers the following comments for your convenience. 2. Each of the two proposed lots must have its own water service line. Due to the limited capacity of the existing 3" cement asbestos water main on the north side of the property, only one of these parcels may be served by that 3" water main. The other parcel will need to be served by the existing 6" cement asbestos water main in Bermuda St. 3. The existing ¾" copper water service line that currently serves the existing single story residence on the property may be used to serve Parcel 2, but it may not also serve Parcel 1. This existing water service was installed in 1960, and replacement of this existing water service line is highly recommended, when a new building is constructed on Parcel 2. 4. A new water service line will be required to serve the existing single story residence on the property in Parcel 1. It must be located entirely within Parcel 1 and the adjacent rights of way. No portion of it may lie on Parcel 2. 5. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
| 04/14/2022 | SBEASLE1 | ZONING | REVIEW | Completed | |
| 04/14/2022 | SBLOOD1 | ENGINEERING | REVIEW | Completed | No comments Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |