Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T22PRE0061
Review Name: PREAPPLICATION MEETING
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/05/2022 | JPEELDA1 | FIRE | REVIEW | Completed | Building might require fire sprinklers. Please contact me so that we can figure out if needed. Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
| 04/12/2022 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
| 04/12/2022 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active | |
| 04/12/2022 | ANY | ELECTRICAL ENGINEERING | REVIEW | Active | |
| 04/13/2022 | NMARTEL1 | ZONING | REVIEW | Completed | Rezoning Pre-Submittal Transmittal FROM: Nick Martell PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting T22PRE0061 Address: 1226 N Columbus Parcel(s): 12212053A Existing Zoning: R-3 Proposed Zoning: C-1 Existing Use: Retail Proposed Use: Retail-General Merchandise Sales/Storage TRANSMITTAL DATE: April 13, 2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Proposed use and use-specific standards: 4.9.9.B.3 and 4.9.13.O (Gen Merch Sales). All land use activities shall be conducted entirely within an enclosed building. 3. Development standards: 30 ft building height 4. Perimeter yard setbacks: Adjacent to R-2 and R-3 zones = 1 ½ H. 5. Applicable street setbacks: Columbus BL is a Collector Street and subject to a 21' setback from the back of the curb. 6. Parking requirements: See UDC Article 7.4.4. https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445 General Merchandise Sales appears to be the primary use on-site. Parking is calculated at 1 space per 300 sq ft GFA 7. Bike parking requirements: See UDC Article 7.4.8 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5698 8. Landscape requirements can be discussed further with Anne Warner at Anne.Warner@tucsonaz.gov 9. Additional comments: a. It's unclear what the heights of the proposed buildings will be. More information is required to determine setbacks. b. It is unclear which uses are being proposed. More information is required to determine use-specific standards. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at nicholas.martell@tucsonaz.gov. |