Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T22PRE0055
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T22PRE0055
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2022 JPEELDA1 COT NON-DSD FIRE Completed Unsure if the existing building has a fire sprinkler system. Additional 1500 sq ft new addition may cause the building to have fire sprinklers installed
New fuel tank will require a permit to be obtained from PDSD and TFD
Fire department access road dead ends. IFC 2018, Appendix D, D103.4 Dead ends. Dead-end fire apparatus access roads in excess of 150 ft shall be provided with width and turn around provisions in accordance with Table D103.4
If you are installing a gate: Gates across a fire department access lane shall conform to IFC 2018, Section 503.2 & Section 503.6. Plans shall show the use of a KNOX Gate key switch if electric gates are installed across the access road.

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
03/22/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed For any water related questions, please send email to Mr. Michael Mourreale at Michael.Mourreale@TucsonAz.gov.


Tim Rowe, P.E., Civil Engineer
Tucson Water, New Area Development Unit
03/30/2022 DSTIFFE1 COT NON-DSD TRAFFIC Completed T22PRE0055
Comments:
1. New 5 Ft wide sidewalk along the entire property frontage
2. New concrete curb returns- 18 Ft. radius minimum (30 radii on the plan is fine)
3. New concrete curb per P.A.G. standard 209
4. New curb access ramps per P.A.G. standard 207 (New curb access ramps need to go in at all of the curb returns)
5. Any existing curb, sidewalk, driveway aprons, curb access ramps which are non- compliant, need to be brought up to standard (The existing driveway at the northern most end of the property, will need to be updated to current standards)
6. At least one sidewalk is required from each street on which the project has frontage, connecting the property to the ROW
7. Existing sidewalk may remain if it is compliant with ADA standards. If less than 4 Ft wide, it will need to be updated to 5 Ft wide
8. Lateral offset for tying into narrower sidewalk is to be done at a 3:1 ratio
9. Sidewalks are required adjacent and parallel to any access or PAAL lane
10. Where adjoining sidewalk from the property ties to sidewalk along the ROW frontage, a 60" X 60" ADA landing is required (this at curb returns or a type 1 curb access ramp) (60" X 6" Landing not to exceed 2% cross slope in all directions.)
11. 3' minimum buffer between curb and sidewalk, unless ROW is limited

David Stiffey
DTM Project Coordinator
David.Stiffey@tucsonaz.gov
03/31/2022 SAMUEL ROGERS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Samuel Rogers, Planner

PROJECT: Thursday Pre-submittal meeting - T22PRE0055
Address: 7171 S FRANCES AV
Parcel(s): 140-40-0520, 140-40-0530, 140-40-0540, 140-40-0550
Zoning: I-1
Existing Use: Transportation Service, Land Carrier
Proposed Use: Transportation Service, Land Carrier

TRANSMITTAL DATE: 03/31/22

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. A lot combo will be required to proceed with the development.
3. Transportation Service, Land Carrier is an allowed use in the I-1 zone.
4. The max allowed height is 75'.
5. Parking is required at 1 space per 300 sq. ft. GFA of administrative or professional office area only
6. Long-term bike parking is required at 1 space per 12,000 sq. ft. GFA. Minimum requirement is 2 spaces
7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932.
03/31/2022 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

PROJECT: Republic Services Tucson Hauling Facility
ACTIVITY NO. T22PRE0055
ADDRESS/PARCEL: 140-40-0520, 140-40-0530, 140-40-0540, 140-40-0550
ZONING: I-1

7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.

Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40’ of a tree is only one of the requirements. The intent is to provide as much shade on the asphalt as possible, and the requirement is 1 tree per 4 parking spaces; trees are expected to be placed within the parking area itself to provide shade on asphalt. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.

7.7. Native Plant Preservation
The NPPO is intended to encourage preservation in place of healthy native plants through sensitive site design that minimizes the disruption of areas within the site containing healthy plants while allowing for salvage and transplanting plants on the site that are likely to survive.
A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted and approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the Unified Development Code (UDC) and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.

Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual – Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening
Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design.
Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf

With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf

If you have any questions about this transmittal, contact Anne Warner, RLA
PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov
03/31/2022 SBLOOD1 ENGINEERING REVIEW Completed 1. The site is in a critical basin. Critical basin detention and first flush retention are required for the entire site. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf With edits to the manual found: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf
2. The detention requirements can be met by the industrial park's detention basin and overall drainage plan.


Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov