Plan Number: T22PRE0039
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T22PRE0039
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/08/2022 MROSS2 COT NON-DSD FIRE Completed 507.1 Required water supply.
An approved water supply capable of supplying the required fire flow for the protection shall be provided to premises on which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.

507.3 Fire Flow.
Fire-flow requirements for buildings or portions of buildings and facilities shall be in accordance with Appendix B of the IFC.

B105.3 Water supply for buildings equipped with an automatic sprinkler system.

For buildings equipped with an approved automatic sprinkler system, the water supply shall be capable of providing the greater of:

1. The automatic sprinkler system demand, including hose stream allowance.

2. The required fire flow.


Automatic Sprinkler Systems
903.2 Where required.
Approved automatic sprinkler systems in new buildings and structures shall be provided in the locations described in Sections 903.2.1 through 903.2.12.

Fire Alarm and Detection Systems
907.2 Where required-new buildings and structures. An approved fire alarm system installed in accordance with the provisions of this code and NFPA 72 shall be provided in new buildings and structures in accordance with Sections 907.2.1 through 907.2.23 and provide occupant notification in accordance with Section 907.5, unless other requirements are provided by another section of this code.



Michael Ross
Tucson Fire Department
520-837-7082
Michael.Ross2@tucsonaz.gov
03/09/2022 SAMUEL ROGERS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Samuel Rogers, Planner

PROJECT: Thursday Pre-submittal meeting - T22PRE0039
Address: 6380S Country Club Rd.
Parcel(s): 14027052C/14027052A
Zoning: P-I
Existing Use: Vacant
Proposed Use: Shell - Commercial Storage/Manufacturing

TRANSMITTAL DATE: 03/09/22

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. A lot combo will be required to proceed with the proposed development.
3. This development is in the TIA Height Overlay zone, ensure compliance with height limitations.
4. General Manufacturing, Precision Manufacturing, and Perishable Goods Manufacturing are allowed uses in the P-I zone and subject to the following Use-Specific Standards:
a. General Manufacturing: 4.9.5.C.2, .4, .5, .6, & .8 and 4.9.13.Q
b. Precision Manufacturing: 4.9.5.C.2, .4, .5, .6, .8, 4.9.5.E.1 & .2 and 4.9.13.Q
c. Perishable Goods Manufacturing: 4.9.5.C.2, .4, .5, .6, & .8 and 4.9.13.Q
5. Commercial Storage (warehouse/distribution) is an allowed use in the P-I zone and subject to Use-Specific Standards 4.9.10.A, 4.9.5.C.8, and 4.9.13.Q.
6. Commercial Storage is required to have 1 parking space per 5,000 sq. ft. GFA.
7. The manufacturing uses are required to have 1 space per 1,000 sq. ft. GF
8. Commercial Storage is required to have 1 long-term bike parking space per 40,000 sq. ft. GFA. Minimum requirement is 2 spaces. Maximum requirement is 10 spaces.
9. The manufacturing uses are required to have 1 long-term bike space per 15,000 sq. ft. GFA. Minimum requirement is 2 spaces. Maximum required is 10 spaces.
10. A pedestrian path will be required to connect the structure to all adjacent ROWs. See Section 7 of the Technical Standards Manual of the UDC for pedestrian circulation requirements.
11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932.
03/09/2022 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

PROJECT: Schnitzer
ACTIVITY NO. T22PRE0039
ADDRESS/PARCEL: 14027052A/C
ZONING: P-1


7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.
• 10’ street landscape border is required for Ginter, Wieding and Country Club Roads

Placing trees along the edge of a parking area or at the ends of parking row does not meet the intent of the UDC. All spaces within 40’ of a tree is only one of the requirements. The intent is to provide as much shade on the asphalt as possible, and the requirement is 1 tree per 4 parking spaces; trees are expected to be placed within the parking area itself to provide shade on asphalt. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.

7.7. Native Plant Preservation
The NPPO is intended to encourage preservation in place of healthy native plants through sensitive site design that minimizes the disruption of areas within the site containing healthy plants while allowing for salvage and transplanting plants on the site that are likely to survive.
A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted and approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the Unified Development Code (UDC) and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.

By far, the easiest way to meet this requirement is to set aside 30% of the lot for Natural Undisturbed Open Space (NUOS).

Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual – Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening
Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design.
https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-manual-board-version-201511.pdf

If you have any questions about this transmittal, contact Anne Warner, RLA
PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov
03/09/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed See the "Documents" section of PRO for document titled "Tucson Water, review comments"
03/10/2022 SROGERS2 COT NON-DSD TRAFFIC Completed T22PRE0039
Comments:
1. New P.A.G. standard 200- concrete sidewalk along entire frontage of property
a. 6 Ft. wide sidewalk along Country Club Rd.
b. 5 Ft. wide sidewalk along Wieding Rd. and Ginter Rd.
2. At least one sidewalk is required from each street on which the project has frontage, connecting the property to the ROW
3. Sidewalks are required adjacent and parallel to any access or PAAL lane
4. Where adjoining sidewalk from the property ties to sidewalk along the ROW frontage, a 60" X 60" ADA landing is required (or at curb returns, a type 1 curb access ramp)
5. 3' minimum buffer between curb and sidewalk, unless ROW is limited
6. P.A.G. standard 207- curb access ramps required at curb returns
7. New P.A.G. standard 207- curb access ramp at SW corner of Ginter/ Country Club Rd.
8. New P.A.G. standard 207- curb access ramp at NW corner of Wieding Rd./ Country Club Rd.
9. New P.A.G. standard 209- concrete curb
10. New curb returns on Country Club Rd. are to have 30' radius
11. New curb returns on Ginter Rd. and Wieding Rd. to have a minimum 18' radius
12. Speed limit sign on Wieding Rd. may need relocated, or new sign foundation

David Stiffey
DTM Project Coordinator
David.Stiffey@tucsonaz.gov
03/10/2022 LOREN MAKUS ENGINEERING REVIEW Completed 1. Site is in a critical basin. Critical basin detention is required. The peak discharge must be reduced by 15 per cent for 2-, 10-, and 100-year events.
2. First flush retention is required.
3. Underground detention and drywells are allowed if they meet the requirements of the retention/detention manual as amended by the City of Tucson and the drainage manual.
4. Underground retention is not allowed unless the water harvesting requirements are met or exceeded.
5. The closest storm drains are in Tucson Boulevard. Site drainage will need to be discharged to the street.

Loren Makus
loren.makus@tucsonaz.gov