Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T22PRE0013
Review Name: PREAPPLICATION MEETING
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/08/2022 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active | |
| 02/08/2022 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
| 02/08/2022 | MROSS2 | FIRE | REVIEW | Completed | Modification to the fire alarm system will be required. Michael Ross Tucson Fire Department Michael.Ross2@tucsonaz.gov 520-837-7082 |
| 02/09/2022 | NICHOLAS ROSS | ZONING | REVIEW | Completed | Rezoning Pre-Submittal Transmittal FROM: Nick Ross; Principal Planner PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting T22PRE0013 Address: 2151 N Palo Verde Blvd Parcel(s): 122-15-250A Existing Zoning: R-2 Proposed Zoning: R-2 (Special Exception) Existing Use: K-12 Elementary & Secondary School (SE) and Religious use. Proposed Use: K-12 Elementary & Secondary School (SE) and Religious use. TRANSMITTAL DATE: February 9, 2022 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Development standards: 25 ft height 3. Lot coverage: 15% max; please provide accurate lot coverage (See table 6.3-2.B in UDC). 4. Proposed use and use-specific standards: N/A 5. Perimeter yard setbacks: 10ft or 3/4H of the structure. Please provide accurate setback info for new structures. 6. Applicable overlays: N/A 7. Major Streets and Routes Plan: N/A 8. Applicable street setbacks: Minimum 20ft from one street and 10ft on the other street is required. 9. Parking requirements: School use = 1 space per 10 students + 1:300sqft GFA of office use. Religious = 1:300sqft 10. Bike parking: School use = Short term - 1 space per 20 students; Long term - 1 space per 10 employees plus 1 space per 20 students. Religious use = Short term - 1 space per 8,00sqft; Long term 1 space per 12,000sqft. 11. Landscape requirements can be discussed further with Anne Warner at anne.warner@tucsonaz.gov 12. Additional comments: Comply with use-specific standards, or modify through conditions of special exception 13. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at nicholas.ross@tucsonaz.gov. |
| 02/09/2022 | LOREN MAKUS | ELECTRICAL ENGINEERING | REVIEW | Completed | 1. Maximize water harvesting. 2. Show roof drainage and show that sidewalks are kept free from roof or surface drainage. 3. Show pedestrian connections to existing facilities and to streets. Loren Makus loren.makus@tucsonaz.gov |