Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: T22PRE0013
Parcel: Unknown

Review Status: Active

Review Details: PREAPPLICATION MEETING

Plan Number - T22PRE0013
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2022 JOHN BEALL M&C Public Hearing 4 Plan Amendment Set M&C Public Hearing Date Active
02/08/2022 BILLIE LEE COMMENTS COMMENTS Active
02/08/2022 MROSS2 FIRE REVIEW Completed Modification to the fire alarm system will be required.


Michael Ross
Tucson Fire Department
Michael.Ross2@tucsonaz.gov
520-837-7082
02/09/2022 NICHOLAS ROSS ZONING REVIEW Completed Rezoning Pre-Submittal Transmittal

FROM: Nick Ross; Principal Planner
PDSD Zoning Review

PROJECT: Rezoning Pre-submittal meeting T22PRE0013
Address: 2151 N Palo Verde Blvd
Parcel(s): 122-15-250A
Existing Zoning: R-2
Proposed Zoning: R-2 (Special Exception)
Existing Use: K-12 Elementary & Secondary School (SE) and Religious use.
Proposed Use: K-12 Elementary & Secondary School (SE) and Religious use.

TRANSMITTAL DATE: February 9, 2022

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Development standards: 25 ft height
3. Lot coverage: 15% max; please provide accurate lot coverage (See table 6.3-2.B in UDC).
4. Proposed use and use-specific standards: N/A
5. Perimeter yard setbacks: 10ft or 3/4H of the structure. Please provide accurate setback info for new structures.
6. Applicable overlays: N/A
7. Major Streets and Routes Plan: N/A
8. Applicable street setbacks: Minimum 20ft from one street and 10ft on the other street is required.
9. Parking requirements: School use = 1 space per 10 students + 1:300sqft GFA of office use. Religious = 1:300sqft
10. Bike parking: School use = Short term - 1 space per 20 students; Long term - 1 space per 10 employees plus 1 space per 20 students. Religious use = Short term - 1 space per 8,00sqft; Long term 1 space per 12,000sqft.
11. Landscape requirements can be discussed further with Anne Warner at anne.warner@tucsonaz.gov
12. Additional comments: Comply with use-specific standards, or modify through conditions of special exception
13. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at nicholas.ross@tucsonaz.gov.
02/09/2022 LOREN MAKUS ELECTRICAL ENGINEERING REVIEW Completed 1. Maximize water harvesting.
2. Show roof drainage and show that sidewalks are kept free from roof or surface drainage.
3. Show pedestrian connections to existing facilities and to streets.
Loren Makus
loren.makus@tucsonaz.gov