Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T22PI00013
Parcel: Unknown

Review Status: Active

Review Details: PIA - SUBMITTAL

Plan Number - T22PI00013
Review Name: PIA - SUBMITTAL
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/18/2022 ANY PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Active Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter Which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines.
08/23/2022 GARY WITTWER DOT LANDSCAPE REVIEW Reqs Change DTM Landscaping:

Please have them add the following notes to the plan.

City of Tucson
Department of Transportation & Mobility
Standard Notes for Planting in Right of Way

1. It is the owner’s responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Unified Development Code Technical Standards Manual section 10.
2. It is the owner responsibility to keep a 5’ wide (minimum) by 7’ tall clear pedestrian access open across the entire property.
3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15’ high clear zone over the travel lane.
4. Final plant locations must be in compliance with all utility setback requirements.
5. The owner understands that if the City of Tucson Department of Transportation & Mobility or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair.
6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities.
7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property (excluding water meter).
8. Contractor to obtain a ROW permit prior to construction within the ROW.



City of Tucson
Department of Transportation and Mobility
Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way

1. Private irrigation facilities roadway crossings will only be permitted in residential roadways and NOT permitted in arterial or collector roadways.
2. Lateral lines under constant pressure shall not be permitted in the public rights-of-way.
3. The HOA/Owner will register private irrigation facilities placed in the public rights-of-way with Arizona 811and become an Arizona 811 Blue Stake Inc. member.
4. Minimize the number of roadway crossings.
5. Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). To the extent possible, the easements should be created at the time of development/platting.
6. Irrigation lines shall be placed in ductile iron sleeves.
7. Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT.
8. HDPE continuous line (no joints under the pavement)
9. Irrigation lines shall have a minimum of thirty (30) inches of cover.
10. Detectable marking tape shall be installed.
11. Curb shall be marked/stamped with “IS” (Irrigation System) and/or placard at back of curb.



Thanks,

David



David Marhefka, PLA
da’-vid mär-hef’-ka
Landscape Architect Project Manager
City of Tucson
Department of Transportation and Mobility
(m) 520-403-5074
08/23/2022 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
08/23/2022 ZELIN CANCHOLA DOT TRAFFIC REVIEW Reqs Change DTM Traffic Engineering:
Greg Orsini

Sheet 6 of 8: When vertical curb is provided without a bike lane, WS6 Edge Strip is not required.
08/23/2022 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter Which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines.
08/23/2022 JIM FEMLING DOT STREET MAINTENANCE REVIEW Approved
08/23/2022 ERNIE ENCINAS DOT_ELEC REVIEW Approved
08/23/2022 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change DTM Engineering:
Richard Leigh


1. Add the plan number “I-2022-016” in the title block of each sheet.
2. Add PIA activity number “T22PI00013” on coversheet.
3. Sheet 1 of 8: Revise paving note 8 to reference Updated Sequence No. 2019-2 PAG 406 Mix No. 2
4. Sheet 1 of 8: Provide subdivision recording sequence number or place a placeholder for the number.
5. Sheet 2 of 8: Provide a Concrete Curb table.
6. Sheet 4 of 8: Indicate that the Common Area “A” and “C” are not part of the PIA
7. Sheet 5 of 8: Indicate placement of a Driveway Apron in accordance with PAG Std. Dtl. 206 at Sta. 59+31 LT Littletown Rd in place of wedge curb.
8. Sheet 7 of 8: Revise Section “F” to indicate a 2’ buffer between the back of curb and sidewalk, refer to TSM Sec. 10-01.3.2.3.
9. Sheet 7 of 8: Revise Section “I” to indicate that it is not part of the PIA.
10. Sheet 8 of 8: Revise Detail ‘K” to provide Rip Rap details.
08/23/2022 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review
08/23/2022 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review