Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T22PI00005
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/06/2022 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
04/06/2022 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
06/28/2022 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Reqs Change | 1. Add the notes for Planting in the ROW and Private Irrigation in the ROW to the plans. City of Tucson Department of Transportation & Mobility Standard Notes for Planting in Right of Way 1. It is the owner’s responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Unified Development Code Technical Standards Manual section 10. 2. It is the owner responsibility to keep a 5’ wide (minimum) by 7’ tall clear pedestrian access open across the entire property. 3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15’ high clear zone over the travel lane. 4. Final plant locations must be in compliance with all utility setback requirements. 5. The owner understands that if the City of Tucson Department of Transportation & Mobility or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair. 6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities. 7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property (excluding water meter). 8. Contractor to obtain a ROW permit prior to construction within the ROW. City of Tucson, Department of Transportation and Mobility Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way 1. Private irrigation facilities roadway crossings will only be permitted in residential roadways and NOT permitted in arterial or collector roadways. 2. Lateral lines under constant pressure shall not be permitted in the public rights-of-way. 3. The HOA/Owner will register private irrigation facilities placed in the public rights-of-way with Arizona 811and become an Arizona 811 Blue Stake Inc. member. 4. Minimize the number of roadway crossings. 5. Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). To the extent possible, the easements should be created at the time of development/platting. 6. Irrigation lines shall be placed in ductile iron sleeves. 7. Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT. 8. HDPE continuous line (no joints under the pavement) 9. Irrigation lines shall have a minimum of thirty (30) inches of cover. 10. Detectable marking tape shall be installed. 11. Curb shall be marked/stamped with “IS” (Irrigation System) and/or placard at back of curb. Thanks, David David Marhefka, PLA da’-vid mär-hef’-ka Landscape Architect Project Manager City of Tucson Department of Transportation and Mobility (m) 520-403-5074 |
06/28/2022 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
06/28/2022 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | DTM Traffic Engineering: Comments on La Estancia Parcel 6: - Sheets 5 & 7: is street name sign at all 4 corners necessary? We typically only see them at 2 diagonal corners of a four legged intersection Thank you, Greg |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | |
06/28/2022 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
06/28/2022 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | June 28, 2022 SUBJECT: La Estancia - Parcel 6 PROJECT REVIEWER: Richard Leigh, DTM Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments. 1. Add the plan number "I-2022-005" in the title block of each sheet. 2. Add PIA activity number "T22PI00005" on coversheet. 3. Sheet 1: Provide a place holder for the subdivision plat recording sequence number. 4. Sheet 3: Revise Scupper Detail to indicate placement of barricade railing along the backside of scupper. 5. Sheet 3: Revise Scupper detail schedule to indicate number of cells. 6. Sheet 11: Provide complete details of this proposed temporary turnaround, geometric layout, spot grades. A temporary public/roadway easement may be required. Depict ROW. 7. Sheet 11: Call out placement of a concrete header at end of pavement +/- Sta. 14+00 Paseo Monte Verde. 8. Sheet 11: Call out private irrigation lines, delineate and label irrigation easements. Provide DTM private irrigation installation notes. 9. Sheet 11: Provide complete details of the proposed storm drain culvert near Sta 14+40 Paseo Monte Verde. 10. Sheet 11: Provide a structural section for the temporary turn around at the end of Paseo Monte Verde. 11. Sheet 13 & 14: Verify that all storm drain conduits have a minimum 2' of cover. 12. Sheet 14: Provide complete details for the storm drain laterals to catch basins. 13. Indicate location of proposed no parking signs. 14. Refer to redline drawings for additional comments and comment details. If you have any questions, I can be reached at 520-237-8692 or emailed at Richard.Leigh@tucsonaz.gov. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |
06/28/2022 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. Also, provide utility clearance letters for the fiber optic facility owners identified on the paving plans. |