Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T22PI00002
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/25/2022 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Reqs Change | DTM Landscaping Please add the following notes to the plans. City of Tucson Department of Transportation & Mobility Standard Notes for Planting in Right of Way 1. It is the owner’s responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Unified Development Code Technical Standards Manual section 10. 2. It is the owner responsibility to keep a 5’ wide (minimum) by 7’ tall clear pedestrian access open across the entire property. 3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15’ high clear zone over the travel lane. 4. Final plant locations must be in compliance with all utility setback requirements. 5. The owner understands that if the City of Tucson Department of Transportation & Mobility or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair. 6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities. 7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property (excluding water meter). 8. Contractor to obtain a ROW permit prior to construction within the ROW. City of Tucson, Department of Transportation and Mobility Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way 1. Private irrigation facilities roadway crossings will only be permitted in residential roadways and NOT permitted in arterial or collector roadways. 2. Lateral lines under constant pressure shall not be permitted in the public rights-of-way. 3. The HOA/Owner will register private irrigation facilities placed in the public rights-of-way with Arizona 811and become an Arizona 811 Blue Stake Inc. member. 4. Minimize the number of roadway crossings. 5. Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). To the extent possible, the easements should be created at the time of development/platting. 6. Irrigation lines shall be placed in ductile iron sleeves. 7. Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT. 8. HDPE continuous line (no joints under the pavement) 9. Irrigation lines shall have a minimum of thirty (30) inches of cover. 10. Detectable marking tape shall be installed. 11. Curb shall be marked/stamped with “IS” (Irrigation System) and/or placard at back of curb. Thanks, David David Marhefka da’-vid mär-hef’-ka Landscape Architect City of Tucson Department of Transportation and Mobility (o) 520-837-6618 (m) 520-403-5074 |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
04/25/2022 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | DTM Traffic Engineering - Greg Orsini - Sheet 2, Signing Note 1: Reference to "Pima County Traffic Signing Design Manual" should instead be "Pima County/City of Tucson Signing and Pavement Marking Manual" - Sheets 4-6, plan view: Recommend showing signs referred to in Table on Sheet 2 in plan view on Sheets 4-6 Thank you, Greg |
04/25/2022 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter Which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. |
04/25/2022 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
04/25/2022 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Completed | |
04/25/2022 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | April 25, 2022 SUBJECT: La Estancia - West Offsite PROJECT REVIEWER: Richard Leigh, DTM Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments. 1. Add the plan number "I-2022-005" in the title block of each sheet. 2. Add PIA activity number "T22PI00002" on coversheet. 3. Sheet 3: Revise Sidewalk Scupper schedule to include no. of cells. 4. Sheet 3: Revise Scupper Detail to indicate placement of barricade railing along the backside of scupper. 5. Sheet 4 Thru 6: Revise keynote 2 to indicate the recommended pavement structural section. 6. Sheet 5: Provide curb access ramps to provide ADA access across Via Bombachas for the onsite pedestrian path. 7. Sheet 5: Indicate placement of a private irrigation easement near Sta. 11+50 Via Bombachas. Delineate and label with recording sequence number. 8. Sheet 5: Provide additional details of the proposed pipe culvert. Indicate pipe class, pipe skew, slope of the roadway slopes and ROW limits. The hinge points of cut and fill slopes must have a minimum setback of two feet from right-of-way. A 2' wide, at 2%, buffer between the sidewalk and hinge point should be provided, refer to Sec. 2-01.9.3 of the Technical Standards Manual. If you have any questions, I can be reached at 520-237-8692 or emailed at Richard.Leigh@tucsonaz.gov. |
04/25/2022 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Submit Utility Notification Receipts for the Utilities listed on the DTM Utility Clearance Letter Which can be found at https://www.tucsonaz.gov/tdot/private-improvement-agreement-guidelines. |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
04/25/2022 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |