Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T22CM07618
Parcel: 11450016C

Review Status: Active

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM07618
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
10/04/2022 ANY BUILDING-RESIDENTIAL REVIEW Active
10/05/2022 JCARLTO1 NPPO REVIEW Passed
10/17/2022 SHASEMA1 ENGINEERING REVIEW Approved
10/18/2022 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: T22CM07618
Garage
8499 E WOODLAND RD Zoning SR

TRANSMITTAL DATE:?October 18, 2022


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1.COMMENT: Provide a Residential Plot Plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf This shall in include:
a. Setbacks
b. Zoning of adjacent parcels
c. All Utility lines
d. Property line distances

2.COMMENT: Provide the gross floor area of the Est. House and the other detached accessory structures on the plan, Per UDC Article 6.6.3.E “The total gross floor area (gfa) of all accessory structures shall not exceed 50% of the gfa of the principal structure . Accessory structures less than 200 square feet gfa and accessory dwelling units are exempt from this requirement”


3.COMMENT: Draw dimension and label the height of the new structure measured from design grade to top of wall.

4. COMMENT: Per UDC Article 6.6.3.D. “Accessory structures , except for accessory dwelling units , shall not exceed 12 feet in height, unless attached to a principal structure . If attached to the principal structure , maximum height permitted shall be the same as for the principal structure”
The definition of Building height is the vertical distance measured from the design grade elevation to the highest point of a flat roof; to the deck line of a mansard roof; or to the middle (between the eave and ridge ) of the highest gable of a pitched or hipped roof,

5.COMMENT: Zoning is unable to write DDO comments since there is missing information such as setback dimension.
The minimum setback in the SR zone is the 25’. The required perimeter yard setback from the proposed accessory structure to the south east property line is 25’, the proposed setback is ”. At a minimum, a neighbor’s setback waiver is required to reduce the perimeter yard setback. To secure this waiver the following text shall be provided on the plot plan and be signed and dated by the owner of the property to the south east:
My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan.

Signature: _____________________________

Date: _________________________________

If you are unable to secure the neighbor’s setback waiver a Design Development Option (DDO) will need to be processed and approved to reduce the setback. DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.



If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov