Permit Number: T22CM07208
Parcel: 11007087B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM07208
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/21/2022 SHASEMA1 ENGINEERING REVIEW Reqs Change Project: T22CM07208

Address: 2660 N ALVERNON WY

This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.)

Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.

Instructions:

1. Is this for a new or existing activity application? – Please select New Application.

2. Submission Type – Select Floodplain Use Permit.

3. Project Name – Enter a name for your project.

4. Type of Permit – Select Commercial or Residential (Residential is for work on single family residences and duplexes.)

5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided.

6. Description of Work – Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit.

7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account.

8. Complete the Contractor, Owner and Architect/Engineer sections as applicable.

9. *IMPORTANT* Supporting Documentation Upload – Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful.

10. Sign the application and submit.

Contact Scott Haseman at scott.haseman@tucsonaz.gov, Stephen Blood at Stephen.Blood@tucsonaz.gov, or Loren Makus at Loren.Makus@tucsonaz.gov if you have any questions about the FUP.
09/26/2022 JPEELDA1 FIRE REVIEW Approved
10/06/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
10/11/2022 PAUL CAMARENA ZONING REVIEW Approved
10/11/2022 PCAMARE1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/18/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation). Complete recirculation of ventilation air from toilet rooms is prohibited. Reference: Section 403.2.1 (4), IMC 2018.
10/18/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify that the pipe size called out to serve the water closet and the urinal will not result in a water velocity greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). The branch pipe sizing chart on P200 would indicate that at least a 1" pipe is required. Reference: Section 107.2.1, IBC 2018.
2. Show how the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.
10/18/2022 ROBERT SHERRY WATER REVIEW Completed
10/18/2022 WILDAN BUILDING-COMMERCIAL REVIEW Reqs Change Activity Number: T22CM07208

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

Denied
Sheet A002 Provide Key notes for the numbered items on the site plan. Show Accessible path of travel to the accessible Parking and the Public way IBC Chapter 10 and Chapter 11.
Sheet A601 Drinking fountains shall comply with Protruding Objects section of ADAAG 602.1
Sheet M100 Provide detail for installing unit on existing truss


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov