Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM07185
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2022 | SHASEMA1 | ENGINEERING | REVIEW | Passed | |
09/26/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Sheet 1; Plans are incomplete and a complete plan review is unable to be performed without the necessary information. Se items below: (Note: the list is provided as a guide and cannot comprehensively itemize all required information without knowing full scope of work.) Provide a project narrative that describes the scope of new work and existing along with a demo plan. Provide a detailed Site Plan inclusive of all parking, etc... Provide wall section details and roof construction details in order to verify proposed construction and height and height and area. Accessibility details. Scaled floor plans with dimensions. A list of all deferred items added to cover. Means of Egress plan Door schedule MEPs as applicable. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner Tucson Fire Department |
10/04/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Faucets serving lavatories in all buildings other than R3 occupancies, individual units in R2 occupancies, or International Residential Code structures shall be automatic faucets dispensing a maximum of 0.25 gallons per cycle. The cycle time shall not be less than ten-seconds for accessibility. Reference: Section 419.6, IPC 2018 as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the public restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018. 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 4. Clarify the routing of the plumbing vents. The vents appear to be routed below the floor. Verify that all of the vents rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2018. |
10/04/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The 2018 International Mechanical Code with Local Amendments is the relevant code for this project, not the IRC. 2. Provide heating and cooling load calculations to justify the heating/cooling capacity of the specified HVAC unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 3. Show that the specified heat pump for the addition complies with the requirements of Section C403, IECC 2018. Reference: Section C502.2.3, IECC 2018. 4. Show the size, routing, and termination of the condensate drain. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. 5. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018. 6. Provide information on the sequence of operation and the required exhaust air flow rate for the restroom exhaust fan. Reference: Section 107.2.1, IBC 2018. |
10/04/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/05/2022 | PAUL CAMARENA | ZONING | REVIEW | Approved | |
10/05/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1 verify that there is a GFI protected 120 volt rooftop receptacle for Mechanical equipment maintenance. NEC 210 2 Provide 2018 IECC compliance for rhe lighting. Ref; 2018 IBC 107.2.1, 2017 NEC |
10/05/2022 | PCAMARE1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/11/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Activity Number: T22CM07185 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Denied Sheet A1.0 Provide dimension on all restroom items showing compliance with ADAAG. Sheet A1.0 Key note 16 is missing Sheet A1.0 Provide Accessible door Hardware per ADAAG and IBC Chapter 10. This is not a residential use. Sheet M1 Provide dimensions for all door clearances per ADAAG and Chapter 10 of the IBC. Sheet M1.0 Provide documentation showing compliance with 2018 IECC for Mechanical System. Sheet M1.0 Revise the note as requirements of the 2018 IMC Sheet M1 Show location of Electrical Panel. Sheet T1 Occupancy shall be B as anOffice. Sheet T1.0 Provide a dimensioned floor plan showing all required exits and accessible entrances. Show accessible paths of travel to accessible parking and the public way. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |