Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM07009
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/14/2022 | SHASEMA1 | ENGINEERING | REVIEW | Reqs Change | Project: T22CM07009 Address: 10036 E EL POSO TR This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Instructions: 1. Is this for a new or existing activity application? – Please select New Application. 2. Submission Type – Select Floodplain Use Permit. 3. Project Name – Enter a name for your project. 4. Type of Permit – Select Commercial or Residential (Residential is for work on single family residences and duplexes.) 5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided. 6. Description of Work – Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit. 7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account. 8. Complete the Contractor, Owner and Architect/Engineer sections as applicable. 9. *IMPORTANT* Supporting Documentation Upload – Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful. 10. Sign the application and submit. Contact Scott Haseman at scott.haseman@tucsonaz.gov, Stephen Blood at Stephen.Blood@tucsonaz.gov, or Loren Makus at Loren.Makus@tucsonaz.gov if you have any questions about the FUP. |
09/19/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM07009 10036 E El Poso Tr - RX-1 Master Bath Addition & Renovation (1st Review) TRANSMITTAL: September 19, 2022 This site is located in the RX-1 zone (UDC 4.7.6). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-1). See Use-Specific Standards 4.9.7.B.6, .8, & .9. COMMENT: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Show all structures on the site on the plot plan. There are two (2) detached accessory structures located south of the existing SFR. The southern most accessory structure appears on aerial photos some time after 2010. Zoning was not able to find approved permit documents for this structure. Either provide approved permit documents or include it in this permit. It does not appear that this structure meets the required 20’-0” perimeter yard setback requirement, see UDC Table 6.3-1.A. If this structure does not meet perimeter yard setbacks at a minimum a neighbor’s setback waiver is required. Per UDC Article 6.6.2.D An accessory structure that exceeds the allowable height of a wall within a perimeter yard and is detached from a principal structure shall comply with the perimeter yard width standards of the principal structure, except that the accessory structure may be built to a parcel line with the consent of the adjoining or, when separated by an alley, adjacent property owner(s). To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s): My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan. Signature: _____________________________ Date: _________________________________ 2. The proposed bathroom addition does not meet the required 20’-0” perimeter yard setback requirement, see UDC Table 6.3-1.A, a Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
09/30/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM07009 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied NPR T22CM07009-STRUC-10036-E-EL-POSO-TRAIL, TUC AZ 9-30-22 (1.5 Hrs.) Please make corrections and resubmit. Resubmittal shall include a response letter. All code references are to the IRC edition as adopted by Tucson, AR & City of Tucson Amendments to the 2018 IRC unless otherwise noted. Recommend clouding changes to speed up the rereview. 1. Provide documentation and details of the continuous load path from the roof to foundation on sheets 6-9 Foundation Plans, Framing Plans and Details. Specify the type and spacing of all anchors, straps, connectors and clips as per IRC-R301. 2. Headers and beams must be specified and manufacturer’s installation requirements provided on sheets 7 and 8 showing Roof Framing Plans. 3. Revise plans with roof framing details to include framing members, lumber type, grade, size, span, dimensions, spacing, anchoring and attachment information as per 2018 IRC Section R802.3-802.5. 4. Uplift resistance to minimize microburst effects shall be determined by either method 1 or 2 below as per 2018 IRC Amend Section R802.11.1 Uplift resistance: 1) Design-based wind uplift criteria. Wind uplift requirements shall be determined by using the design wind value of 115 mph within Table R802.11 for the continuous load path transmitting the uplift forces from the rafter or truss ties to the foundation. 2) Prescriptive-based wind uplift criteria. (Please note that the requirements of this Section are in addition to those required for the structural connection of wood members). 2.1 Conventionally-framed wood or cold-formed steel structures. All bearing wall vertical connections shall be clipped with either approved structural sheathing or approved clips to provide a continuous load path from the joist or truss through the ledger or top plate to the bottom wall plate. Where clips are used, they shall be minimum Simpson H2.5 (A34 at ledger), or equivalent load capacity, of configuration to match connection and spaced at intervals not to exceed 24". At openings, lower cripple studs do not require clipping but king/trimmer studs require double clips at bottom and upper cripples require both full clipping to header as well as header to king stud. All platform framing requires either strapping listed for the purpose or continuous sheathing over rim joist from stud to stud vertically at each floor level. All non-bearing exterior walls shall be clipped as above except that the spacing may be extended not to exceed every other stud. 2.2. Masonry or concrete structures. If lateral design requires larger anchors or more conservative spacing, these may be used in lieu of those called out in this Section. 2.2.1. Roof bearing on wall top plate. Top plates shall be secured to masonry or concrete walls with minimum 0.5" embedded anchor boltsspaced at intervals not to exceed 48". Each joist or truss shall be clipped to plate at bearing with minimum Simpson H2.5 or equivalent loadcapacity and of configuration to match connection. Gable end joists or trusses shall also be clipped at intervals not to exceed 48". 2.2.2. Roof bearing on wall ledger. Joists or trusses bearing on a wall ledger shall be secured to masonry or concrete walls with minimum Simpson PAI23 purlin anchors or equal with equivalent load capacity listed for the application andembedded into wall per listing at intervals not to exceed 48”. Nonbearing roof diaphragm edges shall have the outermost joist or truss likewise anchored to the wall through blocking. 5. Provide documentation and details of the required Roof Plan showing pitch of roofs & drainage as per IRC-Ch. 9. 6. Provide documentation and details of the Concrete, Materials for Concrete, and Forms. Materials used in concrete, the concrete itself and forms shall conform to requirements of this section or ACI 318 as per IRC-R404.1.3.3 Concrete, Materials for Concrete, and Forms. 7. Provide documentation and details of the Steel Reinforcement. Steel reinforcement shall comply with the requirements of ASTM A615, A706, or A996. ASTM A996 bars produced from rail steel shall be Type R. In buildings assigned to Seismic Design Category A, B or C, the minimum yield strength of reinforcing steel shall be 40,000 psi (Grade 40) (276 MPa). In buildings assigned to Seismic Design Category D0, D1 or D2, reinforcing steel shall comply with the requirements of ASTM A706 for low-alloy steel with a minimum yield strength of 60,000 psi (Grade 60) (414 MPa) as per IRC-R404.1.3.3.7.1. 8. Provide documentation and details of the footings & foundation plan for the addition as per IRC-R106. 9. Provide documentation and details of the required wall bracing details and method, including but not limited to the garage as per IRC-R602.10. a. Show braced wall lines for the new addition as per IRC-R602.10.1. b. Show braced wall panels for the new addition as per IRC-R602.10.2. c. Show required length (minimum) of bracing for the new addition as per IRC-R602.10.3 & R602.10.5. d. Show construction methods for braced wall panels for the new addition as per IRC-R602.10.4. e. Show simplified wall bracing as per IRC-R602.12. 10. Provide documentation and details of the required Roof decks shall be coveredwith approved roof coverings secured to the building or structure in accordance with the provisions of this chapter. Roof assemblies shall be designed and installed in accordance with this code and the approved manufacturer's instructions such that the roof assembly shall serve to protect the building or structure as per R903.1. 11. Provide documentation and details of the required foundation construction shown on sheet 6 Foundation Plan, shall be capable of accommodating all loads in accordance with Section R301 and of transmitting the resulting loads to the supporting soil. Fill soils that support footings and foundations shall be designed, installed and tested in accordance with accepted engineering practice as per IRCR401.2. 12. Provide documentation and details of the required Drainage. All drainage shall conform to the requirements of Chapter 32A of the Phoenix City Code as per IRC-R401.3 13. Provide documentation and details of the required Soil Tests. Where quantifiable data created by accepted soil science methodologies indicate expansive soils, compressible soils, shifting soils or other questionable soil characteristics are likely to be present, the building official shall determine whether to require a soil test to determine the soil's characteristics at a particular location. This test shall be done by an approved agency using an approved method as per IRCR401.4 14. Provide documentation and details of the required Geotechnical Evaluation. In lieu of a complete geotechnical evaluation the load-bearing values in Table R401.4.1 shall be assumed. A complete geotechnical evaluation is required for presumptive load-bearing values greater than 1500 pounds per square foot as per R401.4.1. 15. Provide documentation and details of the required structural beams & headers throughout plan on sheets 2-4 as per IRC-R106.1. 16. Provide documentation and details of the concrete slab-on-ground floors on sheets 6 & 9 Foundation Plan & Details to be designed and constructed in accordance with the provisions of this section or ACI 332. Floors shall be a minimum 3 1/2 inches thick (for expansive soils, see Section R403.1.8). The specified compressive strength of concrete shall be as set forth in Section R402.2 as per IRC-R506.1. 17. Provide documentation and details of the Concrete on sheets 6 & 9 Foundation Plan & Details to have a minimum specified compressive strength as shown in Table R402.2. Concrete subject to moderate or severe weathering as indicated in Table R301.2(1) shall be air entrained as specified in Table R402.2 as per IRC- R402.2. 18. Provide documentation and details of the required wall bracing not specified on sheets 6-9 Foundation Plans, Framing Plans and Details as per IRC-602. 19. Provide documentation and details of the Wood Trusses, required to be designed, engineered & manufactured as per shop drawings prepared by truss manufacturer & stamped by a Design Professional as per IRC R802.10 with supporting calculations. 20. Provide documentation and details of the required Bracing. Trusses shall be braced to prevent rotation and provide lateral stability in accordance with the requirements specified in the construction documents for the building and on the individual truss design drawings. In the absence of specific bracing requirements, trusses shall be braced in accordance with accepted industry practice such as the SBCA Building Component Safety Information (BCSI) Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses as per IRC- R802.10.3. 21. Provide documentation and details of the required Truss Design Drawings. Truss design drawings, prepared in conformance to Section R802.10.1, shall be provided to the building official and approved prior to installation. Truss design drawings shall be provided with the shipment of trusses delivered to the job site. Truss design drawings shall include, at a minimum, the following information as per IRC-R802.10.1: 1) Slope or depth, span and spacing. 2) Location of all joints. 3) Required bearing widths. 4) Design loads as applicable. 22. Provide documentation and details of the foundation work and specifically which is existing and which is new which is not specified on sheet 6 Foundation Plan as per IRC-R106. 23. Provide documentation and details of the wall construction and required bracing as per IRC-R602. 24. Provide documentation and details of the non-engineered site-built roofs not specified on sheets 7 & 8 Framing Plans as per IRC-Chapts. 4-9. 25. Provide documentation and details of the engineered trusses with manufacturer’s cut sheets and structural specifications as per IRC-R106. 26. Provide required inspections as per City of Tucson Development Services Department. BUILDING REVIEW COMMENTS: Denied Please make corrections and resubmit. Resubmittal shall include a response letter. All code references are to the IRC edition as adopted by Tucson, AR & City of Tucson Amendments to the 2018 IRC unless otherwise noted. Recommend clouding changes to speed up the rereview. 1. All zoning criteria including but not limited to setbacks shown on sheet 1 Site Plan must comply with Tucson, AR & City of Tucson Amendments to the 2018 IRC. 2. Clarify Existing Floor Plan with Proposed New Construction as per IRC106. 3. Provide required design criteria including but not limited to story height, Dead load, live load, roof load, Wind Speed, Weathering, and Table R301.2 Climatic and Geographic Design Criteria. Buildings shall be constructed in accordance with the provisions of this code as limited by the provisions of this section as per IRC-R301. 4. Provide documentation and details of Building section(s) denoting construction and structural load path(s) as per IRC-106. 5. Provide documentation and details of Building Elevation(s) denoting construction denoting story heights and exterior materials & finishes as per IRC-106. 6. Provide documentation and details of Minimum Ceiling Height. Habitable space & hallways shall have a ceiling height of not less than 7 feet. Bathrooms, toilet rooms and laundry rooms shall have a ceiling height of not less than 6 feet 8 inches as per IRC-R305.1. 7. Provide documentation and details of stair to second floor on sheets 2-5 as per IRC-R311. 8. Provide documentation and details of guard/handrails at both stair(s) and Play Area Level 2 adjacent to 2-story open space below on sheets 2-5 as per IRC-R311-312. 9. Provide documentation and details of required Vapor Retarder to be shown on sheet 9-Details 1-6. A 6-mil polyethylene or approved vapor retarder with joints lapped not less than 6 inches shall be placed between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist as per IRC- R506.2.3. 10. Provide documentation and details of required soil bearing value on sheet(s) 6 Foundation Plan as per IRC-R401.3 & R403.1. 11. Provide documentation and details of required drainage. All drainage shall conform to the requirements of Chapter 32A of the Phoenix City Code as per IRC-R401.3. 12. Provide documentation and details of required Height Above Finished Grade for Typ. Weep Screen Detail 5 on Sheet 9 of Details. Concrete and masonry foundation walls shall extend above the finished grade adjacent to the foundation at all points not less than 4 inches where masonry veneer is used and not less than 6 inches elsewhere as per IRC-R404.1.6. 13. Provide documentation and details of required Wood Joists And Girders to be specified on sheets 7 & 8 of Roof Framing Plans as per IRC-R502, R602 & R802. 14. Provide documentation and details of required Chemical Termiticide Treatment as referenced on sheet 6 Foundation Plan. Chemical termiticide treatment shall include soil treatment or field-applied wood treatment. The concentration, rate of application and method of treatment of the chemical termiticide shall be in strict accordance with the termiticide label as per IRCR318.2. 15. Provide documentation and details of required wall bracing, lines, panels, length of bracing & method as per IRC-R602.10. 16. Provide documentation and details of required minimum Sheathing Materials. Sheet 2 Floor Plan Level 1 indicates 3/8” sheathing. Structural sheathing panels shall consist of minimum 7/16 inch-thick oriented strand board or 15/32-inch-thick plywood as per IRC-R603.9.1. 17. Provide documentation and details of the required water-resistive barrier is installed for exterior wall covering as per IRC703.2. 18. Provide documentation and details of exterior plaster (stucco) including but not limited to lath, plaster, water-resistive barriers, application and curing as per IRC-R703.7. 19. Provide documentation and details of minimum roof sheathing as per IRC-R803.2 & TABLE 803.1. 20. Provide documentation and details of required roof ventilation IRC-R806. 21. Provide documentation and details of required roof covering material and manufacturer’s installation instructions as per IRC-R806. 22. Provide documentation and details of required roof/wall flashing and manufacturer’s installation instructions as per IRC-R903.2. 23. Provide documentation and details of required roof drainage and manufacturer’s installation instructions as per IRC-R903.4. 24. Provide documentation and details of required roof insulation and manufacturer’s installation instructions as per IRC-R903.4. 25. Provide documentation and details of chimney/roof flashing, termination and manufacturer’s installation instructions as per IRC-R903.4. 26. Provide required inspections as per City of Tuscon Development Services Department. MECHANICAL REVIEW COMMENTS: Denied Please make corrections and resubmit. Resubmittal shall include a response letter. All code references are to the IRC edition as adopted by Tucson, AR & City of Tucson Amendments to the 2018 IRC unless otherwise noted. Recommend clouding changes to speed up the rereview. 1. Designate the locations, capacity and fuel type (electric or gas) of the heating and air conditioning equipment. Designate the locations of each supply register, return air grill and all ductwork. Show duct size and material. 2. The dwelling must be provided with heating and cooling capable of maintaining a room temperature established by City of Tucson at a point 3 feet above the floor, and 2 feet from exterior walls (IRC R303.9 as amended). 3. Identify location(s) of programmable thermostat(s) and provide specifications to show compliance with (IRC N1103.1.1, IECC R403.1.1). 4. Show exhaust fan locations for bathrooms, water closet compartments and laundry rooms in lieu of operable windows. 5. Detail and note on plans the method of meeting combustion air requirements for gas appliances such as water heater on sheet 15 (IRC G2448). 6. Identify location of the required dryer vent and shown/note compliance with length limitations per (IRC M1502.4.4). 7. Show provisions for and route of secondary condensate drain for air conditioning equipment. 8. Provide Whole-house mechanical ventilation systems are required existing dwellings with a rebuilt thermal envelope, or detached habitable structures per IRC M1507.3. 9. All new mechanical system installations shall comply with mechanical system sizing per ACCA (Manual J – for Building Heating/Cooling loads), ACCA (Manual S – for Equipment sizing), & ACCA (Manual D – for Duct sizing) per IRC M1401.3, IRC M1601.1, IRC N1103.6, IECC R403.6, or other approved methods. Provide heating and cooling compliance calculations and methodology on plans. 10. Verify specific exhaust ventilation is required in each kitchen, bathroom, water closet, laundry room, and other rooms where water vapor or cooking odor is produced. The minimum source specific ventilation effective exhaust capacity shall not be less than levels specified in Table M1507.3. 11. Verify Table M1507.3 Minimum Required Exhaust Rates Laundry/ Bathrms Kitchens Intermittently Operating 50 cfm 100 cfm Continuous Operation 20 cfm 25 cfm 12. Provide gas riser diagram with pipe sizes, method of sizing and BTU’s of all appliances (IRC G2413). 13. Provide note of required gas Piping Support (IRC G2418). 14. Provide note of required gas Drips and Sloped Piping (IRC G2419). 15. Provide note of required gas Piping Shutoff Valves (IRC G2420). 16. Provide note of required gas Piping Appliance Connections (IRC G2421). 17. Provide note of required gas Piping Flow Controls (IRC G2422). 18. Provide note of required gas Piping Support Intervals (IRC G2424). 19. Provide note of required gas Combustion, Ventilation and Dilution (IRC G2407). 20. Equipment sizing and efficiency rating (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S on building loads calculated in accordance with Manual J or other approved heating and cooling calculation methodologies. 21. Verify Appliance Access for Inspection Service, Repair and Replacement (IRC M1305.1). A level working space not less than 30 inches deep and 30 inches wide shall be provided in front of the control side to service an appliance. 22. Provide required inspections as per City of Tucson Development Services Department ELECTRICAL REVIEW COMMENTS Denied Please make corrections and resubmit. Resubmittal shall include a response letter. All code references are to the IRC edition as adopted by Tucson, AR & City of Tucson Amendments to the 2018 IRC unless otherwise noted. Recommend clouding changes to speed up the rereview. 1. Electrical load calculations shall be provided on sheet 12. 2. Panel schedules shall be provided and incorporated onto the plan on sheet 12. 3. Note the type and amperage of the panel, note the grounding conductor shall be a minimum of 20 feet of #4 bare copper wire embedded in the concrete footing. 4. Note a bonding conductor. A minimum of one #4 copper wire connecting the building's metal water and gas piping system to the service equipment enclosure grounding buss for 200 amp or less SES. 5. One-line diagrams shall be provided and incorporated onto the plan on sheet 12. 6. At least one wall switch controlled light or outlet must be provided in bathrooms, hallways, stairways, attached garages, outdoor entrances or exits and all habitable rooms such as Utility Rm. Adjacent to HVAC unit (IRC E3903). 7. Provide lighting fixture schedule of watts per fixture as per IRC R106. 8. Location of Elec. Panelboard is shown on the exterior and subject to damage. Provide Overcurrent Devices in or on Premises E3705.7. Circuit breakers and switches containing fuses shall: a. Be readily accessible. [240.24(A)] 9. Location of Elec. Panelboard is shown on the exterior and subject to damage. Provide Overcurrent Devices in or on Premises E3705.7. Circuit breakers and switches containing fuses shall: b. Not be located where they will be exposed to physical damage. [240.24(C)] 10. Receptacle outlets shall be provided at each kitchen counter space wider than 12 inches (see space with out receptacle to the right side of dishwasher on sheet 11) and shall be installed so that no point along the wall line is more than 24 inches from a receptacle outlet (IRC E3901.4.1). 11. Provide ground fault circuit interrupter protection for all receptacles in garage (IRC E3902). 12. At least one wall receptacle outlet shall be installed within 36 inches of each lavatory basin in each bathroom (IRC E3901.6). 13. All receptacle outlets located in bathrooms, garages or carports serving kitchen counter tops, located outdoors on sheets 11 & 12 and within six feet of sinks shall have ground fault circuit interrupter protection. Note on the drawings at each outlet requiring such protection (IRC E3902). 14. Arc-fault circuit-interrupters shall be installed in readily accessible locations on sheets 11 & 12. (IRC E3902.15). 15. Provide and specify Arc fault circuit interruption protection Branch circuits that supply 120-volt, single-phase, 15- and 20-ampere outlets installed in kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreations rooms, closets, hallways, laundry areas and similar rooms or areas on sheets 11 & 12 shall be protected (IRC E3902.16). 16. Note and specify that two or more 20 amp small appliance circuits shall be provided to serve the kitchen, breakfast room, and dining room on sheets 11 & 12. Such circuits shall have no other outlets (NEC Article 210-52). 17. Note and specify that at least one 20-amp branch circuit shall be installed to serve the laundry room on sheet 11 and this circuit shall have no other outlets. (IRC E3703.2, E3901.3). 18. Note and specify that 125-volt, single-phase, 15- and 20-ampere receptacles installed in laundry area on sheet 11 shall have ground-fault circuit-interrupter protection for personnel. [210.8(A)(9)]. 19. Note and specify that outlet boxes in the garage side of the wall between the dwelling and the garage and in the garage ceiling on sheet 11 shall be metal or of other materials listed for the use intended (IRC R302.4.2). 20. Indicate the location of all air conditioning and heating units, air handlers, compressors and disconnects on sheets 11 & 12 (IRC 106). 21. Indicate location of convenience outlet and light with switch on sheets 11 & 12 for attic heating and air conditioning equipment (IRC E3901.12 & E3903.4). 22. Where ceiling fans are shown on the plans of sheets 11 & 12, provide a note indicating that outlet boxes approved for supporting ceiling fans shall be used (IRC E3805.8). 23. Provide required inspections as per City of Tucson Development Services Department. PLUMBING REVIEW COMMENTS: Denied Please make corrections and resubmit. Resubmittal shall include a response letter. All code references are to the IRC edition as adopted by Tucson, AR & City of Tucson Amendments to the 2018 IRC unless otherwise noted. Recommend clouding changes to speed up the rereview. 1. Provide documentation and details of the required Water conservation & Connections to Drainage System. Plumbing fixtures, drains, appurtenances and appliances used to receive or discharge liquid wastes or sewage shall be directly connected to the sanitary drainage system of the building or premises, in accordance with the requirements of this code. This section shall not be construed to prevent indirect waste connections where required by the code.All new residential dwelling units shall include piping to allow separate discharge of graywater for direct irrigation in accordance with Table 2601.2. When feasible, all gray water discharge piping shall be installed to allow for gravity distribution as per City of Tucson Amendments to the 2018 IRC. 2. Provide documentation and details of all gray water systems shall be designed and operated according to the provisions of the applicable permit authorized by ADEQ under the Arizona Administrative Code, Title 18, Chapter 9 as per Section P2601.2.1 Gray water piping & City of Tucson Amendments to the 2018 IRC. 3. Provide documentation and details of Subsoil drains conforming to Table P3302.1 & min. 4 inches in diameter. Where the building is subject to backwater, the subsoil drain shall be protected by an accessibly located backwater valve. Subsoil drains shall discharge to a trapped area drain, sump, dry well or approved location above ground. The subsoil sump shall not be required to have either a gas-tight cover or a vent. The sump and pumping system shall comply with Section P3303 as per IRC-P3302.1 Subsoil Drains. 4. Provide documentation and details of the required Drainage. All drainage shall conform to the requirements of Chapter 32A of the Phoenix City Code as per R401.3. a. All drainage facilities shall comply with the City of Phoenix Stormwater Policies and Standards Manual. b. Geotechnical reports certifying the compaction or acceptability of all fills shall be required except as exempted by Section 32A-15.C. c. Erosion prevention. Adequate provision shall be made to prevent surface waters from damaging the face of an excavation or fill. All slopes shall be protected from surface water runoff from above by berms, swales, walls, stabilized slope treatment, or other protection as approved by the Planning and Development Director. 5. Provide documentation and details of the required Identification of each length of pipe and tubing and each pipe fitting, utilized in a fuel gas system, shall bear the identification of the manufacturer as per IRC-G2412.5. 6. Provide documentation and details of the required Access to Shutoff Valves. Shutoff valves shall be located in places so as to provide access for operation and shall be installed so as to be protected from damage as per IRC-G2420. 7. Provide documentation and details of the required Identification of Shutoff Valves. Each house line shutoff valve shall be plainly marked with an identification tag attached by the installer so that the piping systems supplied by such valves are readily identified as per IRC-G2420.5.3. 8. Provide documentation and details of the required appliance gas Shutoff Valves shall be Located Within Same Room as the appliance. The shutoff valve shall be within 6 feet of the appliance, and shall be installed upstream of the union, connector or quick disconnect device it serves as per IRC-G2420.5.3. 9. Provide documentation and details of the required Interval of Support of Piping not exceeding the spacing specified in Table 415.1. Spacing of supports for CSST shall be in accordance with the CSST manufacturer's instructions as per IRCG2418. 10. Provide documentation and details of the Venting Systems Required for all gas appliances by detailed drawings specifying but not limited to size, installation, supports, clearances, fireblocking, cleanouts, listing/ labeling, roof penetration, termination, minimum height & marking as per IRC-Chapt. 24. 11. Provide documentation and details of the specific gas appliances identified herein to meet the requirements for the approval, design, installation, construction, alteration maintenance, and repair of the appliances and equipment specifically noted as per Chapter 24 of IRC. 12. Provide documentation and details of the Piping systems shall be of such size and so installed as to provide a supply of gas sufficient to meet the maximum demand and supply gas to each appliance inlet at not less than the minimum supply pressure required by the appliance as per Section G2413 (402) Pipe Sizing. 13. Provide documentation and details of the Design and Construction of the venting of Appliances required gas to be vented shall be connected to a venting system designed and installed in accordance with the provisions of Sections G2427.4 through G2427.16 as per IRC-G2427.3.2 (503.3.2). 14. Provide documentation and drawings of the required Water Hammer arrestor. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall conform to ASSE 1010 as per IRC 2903.5. 15. Heat Traps. Provide documentation and drawings of the required vertical pipe risers serving storage water heaters and storage tanks not having integral heat traps and serving a nonrecirculating system shall have heat traps on both the inlet and outlet piping as close as practical to the storage tank as per IRC Ch. 28. 16. Provide documentation and drawings of the discharge piping serving a pressure relief valve, temperature relief valve or combination thereof shall: Terminate not more than 6 inches above and not less than two times the discharge pipe diameter above the floor or flood level rim of the waste receptor & discharge to a termination point that is readily observable by the building occupants as required per IRC P2801. 17. Provide documentation and drawings of the required pan drain shall extend full size and terminate over a suitably located indirect waste receptor or floor drain or extend to the exterior of the building and terminate not less than 6 inches and not more than 24 inches above the adjacent ground surface as required per IRC P2801. 18. Provide sanitary waste riser diagram for second floor bathroom as per IRC R106. 19. Provide cleanouts for entire drainage, waste & vent system as per IRC R106. 20. Provide required inspections as per City of Tucson Development Services Department. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
09/30/2022 | JCARLTO1 | NPPO | REVIEW | Approved | |
10/04/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | All houses shall be within 600' of a fire hydrant and or fire sprinklers shall be installed. Due to the house sq footage 2,000 GPM is required , that means that you would need 2 hydrants within the 600'. There is 1 hydrant located about 769' from the back of the house and the other is 1,027'. Plans shall show that fire sprinklers will be installed and a permit obtained from TFD. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner Tucson Fire Department |