Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM06474
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/02/2022 | SHASEMA1 | ENGINEERING | REVIEW | Approved | |
09/02/2022 | IMONSHI1 | ZONING | REVIEW | Approved | |
09/02/2022 | IMONSHI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
09/10/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM06474 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1.Provide CO detectors to activate at 25 PPM and NO detectors to activate at 3 PP that will activate the ventilation system at .75 cfm per square foot, and this shall be noted on sheet M201 in the sequence of operation, and NO detector symbols shall be shown on the revised plans sheet M101 along with the Co detectors (MMC2018,404) ELECTRICAL REVIEW COMMENTS Denied 1. Show compliance with voltage drop requirements for branch circuits and feeders required in 2018 IECC, C405.9. 2. Sheet E206: Add a note to provide direction for compliance with 2018 IECC, C408.3.1 functional testing of lighting controls. 3. Sheet E400: For new SES, show date calculation was performed for maximum available fault current. NEC 2017 110.24. 4. Sheet E400: Show the method to reduce clearing time for new overcurrent devices rated 1200A or higher for arc energy reduction at the service entrance section. 2017 NEC, 240.87 (B) 5. Sheet E400: All grounding electrodes present at the building shall be bonded together, in addition to generic G8 on grounding and bonding detail, show connection routed and grounding / bonding conductor size. NEC 2017, 250.50 6. Reviewers comment has been withdrawn. 7. Sheet ES1.0: In locations where electrical equipment (SES-H and S-M electrical panels) are likely to be exposed to physical damage, enclosures or guards shall be provided. NEC 2017, 110.27(B) 8. Lighting sheets: Show that emergency luminaires can provide initial illumination not less than the value required along the path of egress at floor level. International Building Code 2018, 1008.3.5. 9. Sheet ES1.0: Show call out for keynote 7 for EV#1 and EV#2.. 10. Show match lines on sheets PLUMBING REVIEW COMMENTS: Approved If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
09/15/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/21/2022 | PSHELTO1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/21/2022 | VVERA1 | OUT TO CUSTOMER | Completed |