Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: RESUBMITTAL
Permit Number - T22CM06357
Review Name: RESUBMITTAL
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/27/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1 Please use the currently adopted 2018 IECC for the lighting power calculations. 2 Indicate the rating in amps for the OCPD in the existing panel feeding the 75KVA transformer. Also provide load calculations for this panel to verify it is withing rated capacity for the new load. 3 Exhaust fan #1 branch circuit (A2-ckt 5,7) does not correlate with the panel schedule. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
09/27/2022 | ANY | MECHANICAL-COMMERCIAL | REVIEW | Active | |
09/28/2022 | SHASEMA1 | ENGINEERING | REVIEW | Passed | |
10/04/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
10/13/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 2. An approved two-way cleanout fitting is a listed single fitting, not field assembled as shown on sheet P0.05. Reference: Sections 707.1 (3), 708.1.3, and 708.1.8, IPC 2018 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. |
10/13/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/17/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/17/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/18/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Completed |