Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM06093
Parcel: 12913217A

Address:
2305 S PARK AV

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM06093
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/22/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM06093

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Structural Calculations for existing roof members to support new RTU’s and the RTU’s which are relocated at the roof per Section 1601.1 of International Building Code 2018.
2. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018.
3. Structural steel, components and fasteners for the canopies which are exposed to weather are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.
4. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed.
AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
1. Provide galvanized bolts on the canopy framing connections.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
1. General: Provide a complete schedule of special inspections and required construction observations in accordance with Chapter 17 of the IBC.
2. The structural sheets indicate that wooden I joists are being used in framing. However, combustible materials are not permitted in Type II construction. Provide different framing materials that are permitted in Type II construction in accordance with Section 603.


MECHANICAL REVIEW COMMENTS:
Denied
1. Provide duct smoke detectors for relocated unit's ac units 8,9 and 11 over 5 ton (IMC2018,606.2.1)


ELECTRICAL REVIEW COMMENTS
Approved


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Plan page A4.1 needs to include Gutter & downspout sizing calculations. -IPC 1106.1, 1106.3, 1106.6
2). Plan page P1.3 or M1.4 need to illustrate gas water heater exhaust termination location. -IFGC 503.1
3). Plan page P2.2 or M1.3 needs to illustrate gas water heater room #145 combustion air method & sizing . -IFGC 304


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
08/23/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments
08/23/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T22CM06093 – DP22-0234
2305 S Park Ave – R-2
Administrative Office – (1st Review)

TRANSMITTAL: August 23, 2022

1. As DP22-0234 has not completed the first review Zoning is not able to compare the building plans to the DP. Once the 1st review of the DP is completed and comments addressed Zoning will review the building plans for compliance with the DP. Additional comments maybe forth coming. Zoning cannot approve the building plans until the DP is approved by all review agencies.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/23/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
09/06/2022 ROBERT SHERRY WATER REVIEW Completed
09/16/2022 JVINCEN1 FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/16/2022 NGARCIA3 OUT TO CUSTOMER Completed