Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM06030
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/30/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/30/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/30/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the scope of work. Are two bathrooms being remodeled (1st and 2nd floors) or just one? Reference: Section 107.2.1, IBC 2018. 2. Provide details to show that the construction of the shower receptors comply with the requirements of Section 421.5, IPC 2018. 3. Detail 1/A4.0 calls for each shower enclosure to have a "new linear drain" but this linear drain does appear to be included in the plumbing fixture schedule. Coordinate the architectural and plumbing designs. Reference: Section 107.2.1, IBC 2018. |
| 08/30/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 08/30/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/30/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/01/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1 Indicate or show the exhaust fan wiring and controls for 1st and 2nd floor restrooms. See mechanical plan for additional information. Also provide branch circuit information both 1st and 2nd floor restrooms. 2 Provide IECC compliance. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 09/01/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 09/20/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Activity Number: T22CM06030 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. BUILDING REVIEW COMMENTS: Denied Sheet A1.0 Restroom shall comply with ICC A117.Provide details of accessible restroom and showers. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |