Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T22CM05920
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/04/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Ref; Line Diagram, Panel schedules, Site Plan. The panel schedules show the panels rated at 120/240, 1 phase. The revised line diagram shows the panels as 3 phase. Please clarify. If the modular breaker panels are rated at 120/240 volts 1 phase, how is this going to work being fed with 120/208 volts 3 phase? Verify that this will not conflict with the modular AC and any other voltage sensitive electrical equipment. The feeder to building #2 panels shows both KEYED NOTES #4 and #6. Please clarify. There are 2 junction/splice boxes for each building feeder per the site plan. The line diagram only shows 1. Please revise the line diagram to reflect the actual proposed installation. The #2/0 Al feeders to the panels from the junction/splice boxes are undersized for the 200-amp OCPD’s in the SES. NEC 240, 310.15(16). If utilizing the Tap Rule(s), specify which one(s) and indicate this on the plan. Also verify distances of the feeders utilizing the Tap Rule(s). Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/04/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |