Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05877
Parcel: 10408078C

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T22CM05877
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/30/2022 LEVANS2 ENGINEERING REVIEW Reqs Change This CM cannot be approved until the associated DP, DP22-0170, is approved.

Lianne Evans
lianne.evans@tucsonaz.gov
10/11/2022 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: T22CM05877
New Sales building
660 W AUTO MALL DR Zoning C-3

TRANSMITTAL DATE:?October 11, 2022


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1.COMMENT: Zoning has reviewed the building plan for compliance with DP22-0170 ,Zoning cannot approve the building plans until the DP is approved.
If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
10/14/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Approv-Cond Activity Number: T22CM05877

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E400: Keyed Note #7 refers to E500 but should probably refer to sheet E200 which has Lighting control panel LRCP schedule.
ES100: Keyed Note #15 chopped off at edge of sheet.


PLUMBING REVIEW COMMENTS:
Approved


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov