Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM05877
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/16/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM05877 – DP22-0170 660 W Auto Mall Dr – C-3 New Auto Sales Building – (1st Review) TRANSMITTAL: August 16, 2022 This site is located in C-3 Zone (UDC Article 4.7.22). Auto sales is a permitted use (UDC Table 4.8-4), subject to Use Specific Standards 4.9.9.G.1& .2. 1. As DP22-0170 has not completed the first review Zoning is not able to compare the building plans to the DP. Once the 1st review of the DP is completed and comments addressed Zoning will review the building plans for compliance with the DP. Additional comments maybe forth coming. Zoning cannot approve the building plans until the DP is approved by all review agencies. 2. Based on the sheet index it appears you are proposing to include the development package sheets in the building plan set. If you include the DP sheets they either need to be the stamped approved DP sheets or marked for reference only. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
08/16/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
08/22/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM05877 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Provide galvanized bolts on the roof screen wall connections that are exposed. 2. DEFERRED SUBMITTAL REQUIREMENTS Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E400: Keyed Note #7 refers to E500 but should probably refer to sheet E200 which has Lighting control panel LRCP schedule. ES100: Keyed Note #15 chopped off at edge of sheet. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Need to add lavatory center to side wall spacing measurement to plan page A150 or A502 -IPC 405.3.1 2). per gas table 402.4(2) the 2" gas main needs to remain full size up to 1st branch & 1st branch is also undersized. -update P201 3). Hose bibs need individual shut off valves on plan pages P101 & P201 -IPC 606.2 4). provide civil utility piping plans for continuation of sewer & water as stated on plan page P101. -IPC 106.3.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
08/30/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/08/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
09/08/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans can be approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/08/2022 | VVERA1 | OUT TO CUSTOMER | Completed |