Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05877
Parcel: 10408078C

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM05877
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/16/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T22CM05877 – DP22-0170
660 W Auto Mall Dr – C-3
New Auto Sales Building – (1st Review)

TRANSMITTAL: August 16, 2022

This site is located in C-3 Zone (UDC Article 4.7.22). Auto sales is a permitted use (UDC Table 4.8-4), subject to Use Specific Standards 4.9.9.G.1& .2.

1. As DP22-0170 has not completed the first review Zoning is not able to compare the building plans to the DP. Once the 1st review of the DP is completed and comments addressed Zoning will review the building plans for compliance with the DP. Additional comments maybe forth coming. Zoning cannot approve the building plans until the DP is approved by all review agencies.

2. Based on the sheet index it appears you are proposing to include the development package sheets in the building plan set. If you include the DP sheets they either need to be the stamped approved DP sheets or marked for reference only.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/16/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
08/22/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM05877

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1.
2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed.
AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
1. Provide galvanized bolts on the roof screen wall connections that are exposed.
2. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E400: Keyed Note #7 refers to E500 but should probably refer to sheet E200 which has Lighting control panel LRCP schedule.
ES100: Keyed Note #15 chopped off at edge of sheet.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Need to add lavatory center to side wall spacing measurement to plan page A150 or A502 -IPC 405.3.1
2). per gas table 402.4(2) the 2" gas main needs to remain full size up to 1st branch & 1st branch is also undersized. -update P201
3). Hose bibs need individual shut off valves on plan pages P101 & P201 -IPC 606.2
4). provide civil utility piping plans for continuation of sewer & water as stated on plan page P101. -IPC 106.3.1


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
08/30/2022 ROBERT SHERRY WATER REVIEW Completed
09/08/2022 JVINCEN1 FIRE REVIEW Approved
09/08/2022 SBLOOD1 ENGINEERING REVIEW Reqs Change The DP needs to be approved before the building plans can be approved.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
09/08/2022 VVERA1 OUT TO CUSTOMER Completed