Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM05812
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/03/2022 | WBERGER1 | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Wyatt Berger Planner PROJECT: T22CM05812 8771 E Escalante Rd Carport for solar installation (1st review) TRANSMITTAL DATE: August 3, 2022 COMMENTS: The following comments are relative to a Board of Adjustment variance (UDC 3.10.3). This site is in the C-1 zone (UDC 4.7.20). A manufactured home is a permitted use in this zone (Table 4.8-4). 1. The site plan for a new manufactured home (T20CM06878) does not show the two porches as depicted on this permit's site plan. Clarify whether the attached porches on the east and west façades of the manufactured home have been constructed. If the porches have already been constructed, include them in this permit's scope of work. 2. Per UDC 6.6.3.C, detached accessory buildings are not permitted in the buildable area extending the full width of the lot between the principal building and the front street lot line. The proposed detached carport may be considered attached to the principal structure if a five-foot-wide roof connection that can support a 20-pound live load is constructed. This roof connection ensures the proposed structure is part of the primary structure. A Board of Adjustment variance is required if the detached carport is not attached to the principal structure. For more information on the variance process, please refer to the following: https://www.tucsonaz.gov/files/pdsd/codes/Zoning_Administration_Application_BA_fillable.pdf. Please contact Mark Castro at Mark.Castro@tucsonaz.gov if you have any questions about the variance process. If you have any questions about this transmittal, please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. |
| 08/03/2022 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
| 08/03/2022 | WBERGER1 | NPPO | REVIEW | Passed | |
| 08/04/2022 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Completed |