Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM05704
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/04/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM05704 Shed 726 N ERIN AV Zoning R-1 TRANSMITTAL DATE:?August 4, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Provide a Residential Plot Plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf. This shall in include: a. Lot coverage calculation that meets the requirements of UDC Article 6.4.3 & the example shown on the residential plot requirements. 2.COMMENT: Draw dimension and label the height of the new structure measured from design grade to top of wall. 3.COMMENT:This site has two lots a lot combination will be required. Lot combinations are handled through the Pima County Assessor's Office. The lot combination request form can be found in this link here: https://www.asr.pima.gov/Downloads/Forms/ComboRequest.pdf. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
| 08/04/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 08/13/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM05704 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DeniedSee building comments. BUILDING REVIEW COMMENTS: Denied Comments: The proposed building is a field-fabricated "weld-up" building with slab-on-grade foundation featuring square tube columns embedded directly in the ground without benefit of base plates of any kind. Additionally, light gauge metal cee purlins are the primary as well as secondary roof structural members. Review of this structure pursuant to the prescriptive provisions of either the 2018 International Residential Code or the 2018 International Building Code is not possible, as there are no such provisions covering this building. As such, design by a professional engineer in accordance with the structural provisions of the International Building Code is needed. MECHANICAL REVIEW COMMENTS: Denied See building comments. No mechanical in the scope of work. ELECTRICAL REVIEW COMMENTS Denied See building comments. PLUMBING REVIEW COMMENTS: Denied See building comments. Also, a water line is indicated to run to the building, but no fixtures are shown. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 08/26/2022 | AWARNER1 | NPPO | REVIEW | Approved |