Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05648
Parcel: 12404100C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM05648
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/09/2022 STEVE SHIELDS ZONING REVIEW Approved
08/09/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
08/09/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the status of the water heater. The Food Service Plumbing Equipment Schedule (P4.1) calls for the existing water to remain but the Plumbing Fixture Schedule (P4.1) calls for a new water heater. Reference: Section 107.2.1, IBC 2018.
2. Provide structural calculations to show that the water heater (approximately 685 pounds) and it's mounting shelf will be safely supported by the building structure. Reference: Section 301.2, IPC 2018
3. The design of the water heater piping (detail 1/P3.2), with a shutoff valve located between the water heater and the expansion tank and the vacuum relief, makes it impossible for the devices to accomplish their intended purposes. Reference: Sections 303.2, 504.1, and 607.3, IPC 2018.
4. Verify that all of the vents (e.g. vents for the floor sinks and the grease interceptor) rise vertically (i.e. greater than 45 degrees above horizontal) to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2018.
08/09/2022 SCABRAL1 ENGINEERING REVIEW Passed
08/09/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/09/2022 ROBERT SHERRY WATER REVIEW Completed
08/15/2022 JPEELDA1 FIRE REVIEW Approved
08/17/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1 Provide compliance with the 2018 IECC for the lighting.

2 Provide load calculations in amps also.

Re f; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
09/01/2022 WILDAN BUILDING-COMMERCIAL REVIEW Completed