Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05440
Parcel: 12708187F

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM05440
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2022 JVINCEN1 FIRE REVIEW Approved
08/03/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1 Show electrical branch circuits, disconnecting means, for the kitchen hood, water heater, kitchen exhaust fan on the electrical power plans.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code (OLC)
08/04/2022 IMONSHI1 ENGINEERING REVIEW Passed
08/04/2022 IMONSHI1 ZONING REVIEW Approved
08/04/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
08/16/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the installation note for the grease exhaust fan to call for a minimum termination height of 40" above the roof. Reference: Section 506.3.13.1, IMC 2018.
2. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.2.4, IMC 2018 (the hood hanging weight plus the weight of personnel working in or on the hood). Reference: Section 302.1, IMC 2018.
3. The mechanical plan shows an existing high velocity diffuser for the HVAC supply air system in close proximity to the face of the Type I hood. Verify that the location and type of air outlet complies with the hood manufacturer's installation instructions and does not reduce the effectiveness of the exhaust system. Reference: Sections 304.1 and 508.1, IMC 2018.
4. Verify that the evaporative cooling section of the makeup air unit is equipped with a recirculating water system. Reference: Section 928.2, IMC 2018 and ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.gov/viewdocument/?docName=http://www.azleg.gov/ars/45/00313.htm).
08/16/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify that the downstream vent for the hydromechanical grease interceptor rises vertically to at least 6" above the flood rim of the grease interceptor prior to running horizontally. Reference: Section 905.4, IPC 2018
2. The specified hydromechanical grease interceptor (Canplas) requires the installation of a vented, external flow control device. Show how this device is to be installed. Reference: Sections 303.2 and 1003.3.5.2, IPC 2018.
08/16/2022 ROBERT SHERRY WATER REVIEW Completed
08/19/2022 WILDAN BUILDING-COMMERCIAL REVIEW Completed