Permit Number: T22CM05239
Parcel: 12705077C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM05239
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/26/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Plumbing fixtures that receive or discharge liquid waste (e.g. hand sinks) shall be directly connected to the sanitary drainage system. Clarify the apparent contradiction of item 3 of the Plumbing Plan Notes and the Sanitary & Vent Riser Diagram. Reference: Section 301.3, IPC 2018.
2. Connect the discharge of the sump pump to the sanitary drain system as described in Section 712.3.5, IPC 2018, i.e. connect the sump discharge to the top of a horizontal branch drain located above the ceiling. As a gravity flow line, the horizontal drain does not require either a shut off valve or a check valve.
3. Provide a sump vent for the sump pump. Per the manufacturer, an air admittance valve cannot be used with the sump pump. Refer to the manufacturer's installation instructions for further guidance. Reference: Section 906.5.1 and Table 906.5.1, IPC 2018.
07/26/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual cooking appliance (e.g. Unox oven and Turbo Chef oven). Reference: Section 507.1, exception 2, IMC 2018.
07/26/2022 ROBERT SHERRY WATER REVIEW Completed
07/28/2022 IMONSHI1 ZONING REVIEW Approved
07/28/2022 IMONSHI1 ENGINEERING REVIEW Passed
07/28/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
08/03/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
08/15/2022 JPEELDA1 FIRE REVIEW Approved
08/23/2022 WILDAN BUILDING-COMMERCIAL REVIEW Completed