Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM05239
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/26/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Plumbing fixtures that receive or discharge liquid waste (e.g. hand sinks) shall be directly connected to the sanitary drainage system. Clarify the apparent contradiction of item 3 of the Plumbing Plan Notes and the Sanitary & Vent Riser Diagram. Reference: Section 301.3, IPC 2018. 2. Connect the discharge of the sump pump to the sanitary drain system as described in Section 712.3.5, IPC 2018, i.e. connect the sump discharge to the top of a horizontal branch drain located above the ceiling. As a gravity flow line, the horizontal drain does not require either a shut off valve or a check valve. 3. Provide a sump vent for the sump pump. Per the manufacturer, an air admittance valve cannot be used with the sump pump. Refer to the manufacturer's installation instructions for further guidance. Reference: Section 906.5.1 and Table 906.5.1, IPC 2018. |
07/26/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual cooking appliance (e.g. Unox oven and Turbo Chef oven). Reference: Section 507.1, exception 2, IMC 2018. |
07/26/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/28/2022 | IMONSHI1 | ZONING | REVIEW | Approved | |
07/28/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
07/28/2022 | IMONSHI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
08/03/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/15/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
08/23/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Completed |