Permit Number: T22CM05137
Parcel: 113060770

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM05137
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2022 STEVE SHIELDS ZONING REVIEW Approved
07/21/2022 SSHIELD1 ENGINEERING REVIEW Passed
07/22/2022 AWARNER1 NPPO REVIEW Approved
07/30/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM05137

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Clarify the vertical end support for the new glulam beam shown in the dining room. It appears to rest directly above the new door header on the one end, and only supported by a 2x6 double on the other end. Verify the “post down” requirements to support this weight to the foundation.
2. Indicate on the structural load values noted on sheet 4 to indicate a basic designed wind speed of 115 mph and a seismic category B. 2018 IRC table R301.2(1) as amended.
3. Update the framing note 1 on sheet 4 to indicate the 2018 IRC.


BUILDING REVIEW COMMENTS:
Denied
1. Clarify the size of the concrete slab outside of the new dining room exterior doors. The notes on sheets 2 and 3 are different then the dimensions on the floor plans. Also, the site plan indicates there is an existing porch in this location as well. Clarify if the new slab will be a continuation of the existing porch. A minimum if 3’ wide landing is required in the direction of travel outside of an exterior door.
2. Indicate on the drawings that fireblocking will be installed to cut off both vertical and horizontal concealed draft openings between stories and attic or roof area. 2018 IRC R302.11.
3. Indicate that the garage shall be separated from the house with a minimum of ½” gypsum board applied to the garage side. 2018 IRC R302.6. All openings and penetrations shall be protected in accordance with R302.5.
4. Indicate on the drawings that the door 6 from the house to the garage will be a solid wood door or have a minimum of a 20 minute fire rating. 2018 IRC R302.5.


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Manual J to be provided as a differed submittal


ELECTRICAL REVIEW COMMENTS
Denied
1. Indicate a receptacle in the new addition in the hallway. Hallways of 10’ or more in length shall have at least one receptacle installed. 2017 NEC 210.52(H).
2. Indicate on the electrical service diagram that a Ufer ground will be installed (concrete encased electrode) for the grounding of the new panel. 2017 NEC 250.52(A)(3).
3. Note on the electrical drawings that all exterior lighting shall be in compliance with the Pima County regulations.
4. Note on the drawings that the new can lighting installed in the ceiling will be IC rated and sealed for energy efficiency requirements. 2017 NEC 410.66.
5. Update the notes on the drawings to indicate smoke detectors will be installed in the existing house as well as the addition. Smoke detectors shall be installed in each sleeping room, outside of each sleeping room in the immediate vicinity of the bedroom. 2018 IRC R314.2. All smoke detectors shall receive their primary power from the building wiring with a battery backup and shall be interconnected so that the actuation of one alarm will activate all. 2018 IRC R314.4.
6. receive their primary power from the building wiring with a battery backup and shall be interconnected so that the actuation of one alarm will activate all. 2018 IRC R314.4. Smoke detectors and carbon monoxide alarms may be combined.
7. Update the electrical note 11 on sheet 11 to reflect the current code (the code no longer recommends installing the certificate inside of the electrical panel). A permanent certificate shall be completed by the builder or other approved party and posted on a wall in the space where the furnace is located, a utility room or an approved location inside the building. Where located on an electrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect label or other required labels. The certificate shall indicate the predominant Rvalues of insulation installed in or on ceilings, roofs, walls, foundation components such as slabs, basement walls, crawl space walls and floors and ducts outside conditioned spaces; U-factors of fenestration and the solar heat gain coefficient (SHGC) of fenestration, and the results from any required duct system and building envelope air leakage testing performed on the building. 2018 IECC R401.3.
8. Update the electrical note 12 on sheet 11 to indicate a minimum of 90% of all lighting fixtures in the dwelling will contain high-efficacy lamps. 2018 IECC R404.1. (The note at the top of the sheet is correct).


PLUMBING REVIEW COMMENTS:
Denied
1. Update the plumbing notes 7 and 8 to indicate the 2018 IRC to reflect the current code.
2. Note on the drawings that a water hammer arrestor shall be installed where quick closing valves are utilized. 2018 IPC 604.9.
3. Note on the drawings that all plumbing drain, waste and vent systems shall be tested for leaks in accordance with the 2018 IRC P2503.5 prior to concealing



If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
08/15/2022 JVINCEN1 FIRE REVIEW Approved