Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T22CM05122
Parcel: 140062150

Review Status: Completed

Review Details: OTHER

Permit Number - T22CM05122
Review Name: OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/07/2022 RPARSON1 OIP REVIEW Completed
07/20/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM05122

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
Please see review comments entered under "Building".


BUILDING REVIEW COMMENTS:
Denied
1. Please provide a roof plan marked clearly with dimensions for all the code required fire access pathways and clearances around all the existing roof openings.
2. Provide a calculation for the area of the solar panels and provide a calculation for its percentage to the total roof area in support of what the fire-access pathways are provided above.
3. One of the document provided which lists various loads associated with the ballasted system lists various editions of the ASCE 7. The ASCE 7-16 is the current edition adopted in IBC 2018, so all reference for design purpose needs to be based on ASCE 7-16.
4. Provide structural design calculations to show that the proposed ballasted system is structurally adequate to resist the lateral loads associated with wind and seismic. These calculations need to be prepared, signed and sealed by a licensed engineer.
5. Provide structural details for the clip which attaches the module rack to the ballast rack system. This document needs to show structural adequacy of the proposed clip against wind and seismic design forces.
6. Provide a structural evaluation of the existing roof framing system to be able to sustain imposed loads by the proposed roof ballast system.


MECHANICAL REVIEW COMMENTS:
N/A

ELECTRICAL REVIEW COMMENTS
Approved

PLUMBING REVIEW COMMENTS:
N/A

If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
07/20/2022 NGARCIA3 OUT TO CUSTOMER Completed