Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM05103
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/20/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM05103 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. General: No egress plan has been provided. Provide a thorough egress plan. 2. General: The occupant load is not calculated correctly. There are spaces contained within the tenant space that are not business uses. (conference room(assembly), concentrated open office (1004.8), Provide a corrected occupant load in accordance with Section 1004. 3. General: There is an insufficient amount of exit signage provided on the RCP. Provide the requirement amount exit signage in accordance with Section 1013. 4. General; No egress illumination is provided on the RCP. Provide the location of all egress illumination in accordance with Section 1008. 5. General: Ensure that electronically locked egress doors are in compliance with Section 1010.1.9.10. 6. General: Provide evidence of compliance that all interior finishes meet the minimum requirements of Table 803.13. MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied 1. Provide an existing/current one line diagram. PLUMBING REVIEW COMMENTS: Approved If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
07/21/2022 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
07/21/2022 | WBERGER1 | ZONING | REVIEW | Approved | |
07/21/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/04/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/15/2022 | JVINCEN1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/15/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |