Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05103
Parcel: Unknown

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM05103
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/20/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM05103

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Denied
1. General: No egress plan has been provided. Provide a thorough egress plan.
2. General: The occupant load is not calculated correctly. There are spaces contained within the tenant space that are not business uses. (conference room(assembly), concentrated open office (1004.8), Provide a corrected occupant load in accordance with Section 1004.
3. General: There is an insufficient amount of exit signage provided on the RCP. Provide the requirement amount exit signage in accordance with Section 1013.
4. General; No egress illumination is provided on the RCP. Provide the location of all egress illumination in accordance with Section 1008.
5. General: Ensure that electronically locked egress doors are in compliance with Section 1010.1.9.10.
6. General: Provide evidence of compliance that all interior finishes meet the minimum requirements of Table 803.13.


MECHANICAL REVIEW COMMENTS:
Approved

ELECTRICAL REVIEW COMMENTS
Denied
1. Provide an existing/current one line diagram.


PLUMBING REVIEW COMMENTS:
Approved


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
07/21/2022 WBERGER1 ENGINEERING REVIEW Passed
07/21/2022 WBERGER1 ZONING REVIEW Approved
07/21/2022 WBERGER1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/04/2022 ROBERT SHERRY WATER REVIEW Completed
08/15/2022 JVINCEN1 FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/15/2022 NGARCIA3 OUT TO CUSTOMER Completed