Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM05031
Parcel: 13216600A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM05031
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/19/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Coordinate the plumbing and mechanical designs. AC-1, AC-2, and AC-3 are called out as heat pumps in the mechanical design.
07/19/2022 ROBERT SHERRY WATER REVIEW Completed
07/20/2022 IMONSHI1 ZONING REVIEW Approved
07/20/2022 IMONSHI1 ENGINEERING REVIEW Passed
07/20/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
07/21/2022 JVINCEN1 FIRE REVIEW Approved
07/27/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
08/01/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical review comments and provide a written response.
1. Provide compliance with the 2018 IECC for the lighting.
2. Include load calculations for the panel schedules and balance loads between phase as close as possible. Include total electrical service load for the building.NEC 408.3B
Ref; 2018 IBC 107.2.1, 2017 NEC, 2018 IECC.
08/19/2022 WILDAN BUILDING-COMMERCIAL REVIEW Reqs Change Activity Number: T22CM05031

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

Sheet T1.1 Provide the following, Type of construction, Square footage, Occupancy Type, Occupant Load and scope of work.

Sheet A2.1 Provide exit plan for Entire Building. Show Accessible path of travel to the public way and Accessible parking. Provide occupant load of each room.

Sheet A2.1 How do you enter into the workout room?

Sheet A2.2 Show expanded view of Accessible Stall

Sheet A3.1 Is the Ceiling existing or is it new construction?

Sheet A3.1 Show details of ceiling construction if any modifications are part of the scope of work.

Sheet A5. Provide detail of Door Hardware showing compliance with ADAAG and IBC Chapter 10



If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov